What's changing near NW11 9BY
Within 2 km, around Golders Green North in Barnet. Building, planning, schools, transport, prices and crime.
1,329new homes completed within 2 km, last 2 years
42homes given permission on brownfield sites since 2021
-13.0%like-for-like prices in Golders Green North, 2024 → 2025 (council -0.6%)
+2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedflats · Oct 2026
planned Oct 2026
850 m away - New homes
5 new homes completedhouses · Aug 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
52 new homes completedflats · Jun 2026
Jul 2026
1.9 km away - New homes
10 new homes completedflats · Jun 2026
Jun 2026
600 m away - New homes
21 new homes completedhouses · Nov 2024 – May 2026
May 2026
1.4 km away - New homes
63 new homes completedflats · Jan 2026
Jan 2026
1.9 km away - New homes
46 new homes completedflats · Jan 2026
Jan 2026
1.8 km away - New homes
33 new homes completedflats · Jan 2026
Jan 2026
1.9 km away - New homes
27 new homes completedflats · Dec 2025
Dec 2025
2.0 km away - New homes
19 new homes completedflats · Dec 2025
Dec 2025
1.9 km away - New homes
19 new homes completedflats · Dec 2025
Dec 2025
2.0 km away - New homes
5 new homes completedhouses · Dec 2025
Dec 2025
2.0 km away - New homes
Planning applications within 500 m
86applications in the last 12 months
49approved · 17 refused
16still being decided
67net new homes in approved schemes since 2023
- Application Under Consideration
50, Brookside Road, NW11 9NESingle storey rear extensionBarnet 26/3653/PNH · Prior Approval
Oct 2026
300 m away - Application Under Consideration
6, Beverley Gardens, NW11 9DGRoof extension involving rear dormer window, side facing rooflights and new side gable windowBarnet 26/3650/192 · All Other
Oct 2026
200 m away - Application Under Consideration
109, Wentworth Road, NW11 0RHSingle storey rear extension with a maximum depth of 4.0m and maximum eaves height of 3.0m above external ground level, together with a single storey front porch extension. The proposed porch roof will extend and integrate with the existing pitched tiled bay window roof, reflecting similar combined roof forms found on other properties along the road.Barnet 26/3573/HSE · Householder
Oct 2026
350 m away - Application Under Consideration
25, Alba Gardens, NW11 9NSUse of outbuilding as 1no. self contained unitBarnet 26/3225/191 · All Other
Sept 2026
350 m away - Application Under Consideration
28, Brookside Road, NW11 9NEErection of a rear outbuilding (Retrospective Application)Barnet 26/3366/RCU · All Other
Sept 2026
300 m away - Application Under Consideration
8, Wessex Gardens, NW11 9RT2no. single-storey rear extensions with a proposed depth of 6.00 metres, a maximum height of 4.00 metres and an eaves height of 3.00 metres and a proposed depth of 6.00 metres, a maximum height of 3.10 metres and an eaves height of 3.00 metres, following the demolition of the existing rear bay window.Barnet 26/3288/PNH · Prior Approval
Sept 2026400 m away
58homes extended 2021–2025, typically adding 43 m²
104since energy certificates began (2008)
4in NW11 9BY itself
- Extendedcertificate 2026
- Extendedcertificate 2011
- Extendedcertificate 2011
- Extendedcertificate 2010
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
115hours of spills in 2025 between them (typical neighbourhood: about 36)
78spill events counted
- Thames Water
Brentfield Gardens Cso Binto River Brent26 spills, 52 hours in 2025
850 m away - Thames Water
Outside 135 Leeside Crescentinto The Decoy Brook8 spills, 20 hours in 2025
500 m away - Thames Water
N/Ainto Not Applicable18 spills, 15 hours in 2025
700 m away - Thames Water
N/Ainto Not Applicable6 spills, 10 hours in 2025
1.3 km away - Thames Water
N/Ainto Not Applicable3 spills, 5 hours in 2025
1.6 km away - Thames Water
N/Ainto Not Applicable11 spills, 5 hours in 2025
1.4 km away - Thames Water
Outside 115 Wentworth Roadinto Decoy Brook2 spills, 4 hours in 2025
300 m away - Thames Water
Highfield Rd Jct With Brookside Rdinto Decoy Brook2 spills, 4 hours in 2025
450 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
67 planned, approved or being built and 0 running. Those within 5 km are on the map above.
- Energy from waste
Brent Cross CricklewoodApproved, not yet built
Jul 2010
1.2 km away - Rooftop solar
West Hendon Estate, Plots A, C & G - 350 Apartments & Commercial UnitsApproved, not yet built · 230 kW
Aug 2024
2.6 km away - Other
Windmill Court - CommunityPlanning application in
Jan 2025
3.0 km away - Rooftop solar
Henderson Court, Fitzjohns Avenue - Solar PanelsApproved, not yet built · 170 kW
Nov 2022
3.2 km away - Rooftop solar
High Road - Solar PV PanelsApproved, not yet built · 180 kW
Oct 2021
3.7 km away - Rooftop solar
David Lloyd Leisure Centre, Leisure Way - Solar PanelsApproved, not yet built · 330 kW
Jan 2024
3.9 km away - Rooftop solar
Willesden Sports Centre, Donnington Road - Solar PanelsApproved, not yet built · 310 kW
Mar 2025
4.4 km away - Solar farm
Ikea Department Store, Drury Way - Solar Pv CanopiesApproved, not yet built · 700 kW
Oct 2023
4.5 km away - Battery storage
Mill Hill National Grid SubstationApproved, not yet built · 50 MW
Mar 2023
4.6 km away - Rooftop solar
Barnet Burnt Oak Leisure Centre, Watling Avenue - Solar PanelsApproved, not yet built · 200 kW
Nov 2025
4.7 km away - Rooftop solar
Road and street works within 1 km
24 permitted works running now or planned, 22 of them major.
- Major
Limes Avenue, LondonHighway improvement works · LONDON BOROUGH OF BARNET · Road closure
Jul 2026 to Oct 2026
100 m away - Major
Brentfield Gardens, LondonHighway improvement works · TRANSPORT FOR LONDON (TFL) · Road closure
Nov 2026 to Nov 2026
650 m away - Major
Brentmead Place, LondonHighway improvement works · TRANSPORT FOR LONDON (TFL) · Lane closure
Oct 2026 to Oct 2026
650 m away - Major
Off Slip From Hendon Way To Brentfield Gardens, LondonHighway improvement works · TRANSPORT FOR LONDON (TFL) · Road closure
Nov 2026 to Nov 2026
700 m away - Major
North Circular Road, LondonHighway improvement works · TRANSPORT FOR LONDON (TFL) · Road closure
Nov 2026 to Nov 2026
750 m away - Major
Hendon Way, LondonHighway improvement works · TRANSPORT FOR LONDON (TFL) · Road closure
Nov 2026 to Nov 2026
750 m away - Major
Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, LondonHighway improvement works · TRANSPORT FOR LONDON (TFL) · Road closure
Nov 2026 to Nov 2026
750 m away - Major
Hendon Way Off Slip From Brent Cross Roundabout To Brentfield Gardens Southbound, LondonHighway improvement works · TRANSPORT FOR LONDON (TFL) · Road closure
Oct 2026 to Oct 2026
800 m away - Major, planned
Temple Fortune Lane, LondonUtility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026800 m away
Major infrastructure projects within 30 km
- Decideddecided Sept 2014
9.9 km away - Decideddecided Apr 2014
11.4 km away - Decideddecided Feb 2017
12.3 km away - Pre-applicationapplication due March 2027
15.6 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
17.2 km away - Pre-applicationapplication due March 2028
17.7 km away - Pre-application
Transport schemes within 20 km
- Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
1.7 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
6.2 km away - TransportMay 2022
7.1 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
11.7 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
12.0 km away
Approved19, The Grove, NW11 9SJRoof extension involving, hip to gable, crown roof to outrigger, rear dormer window, 3no. front facing rooflights and removal of the chimney. (amended description)Barnet 26/3273/192 · All Other
Sept 2026
100 m away Application Under Consideration22, Highcroft Gardens, NW11 0LX2no. Single storey rear extensions with a proposed depth of 6.00 metres, maximum height of 3.00 metres and eaves height of 3.00 metres, and depth of 3.05 metres, maximum height of 3.00 metres and eaves height of 3.00 metres respectively, following demolition of existing roofed patio.Barnet 26/3218/PNH · Prior Approval
Sept 2026
450 m away Application Under Consideration113, Wentworth Road, NW11 0RHErection of two new detached two storey dwellings with rooms in roofspace, side dormer with obscure side window, 1no. front gable window, 3no. side, 3no. main roof facing rooflights and installation of solar panels following demolition of existing dwelling with raised patio area, access steps to garden with associated amenity space landscaping/refuse/recycling/bicyle storage/EV charging points andBarnet 26/2919/FUL · All Other
Aug 2026
350 m away DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.