What's changing near NR9 3LA
Within 2 km, around Cringleford, Little Melton & Easton in South Norfolk. Building, planning, schools, transport, prices and crime.
176new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.5%like-for-like prices in Cringleford, Little Melton & Easton, 2024 → 2025 (council +0.3%)
+3%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedhouses · Nov 2025 – Sep 2026
Sept 2026
2.0 km away - New homes
30 new homes completedhouses · Nov 2024 – Jun 2026
Jun 2026
1.9 km away - New homes
8 new homes completedhouses · May 2026
Jun 2026
2.0 km away - New homes
7 new homes completedhouses · Apr 2026 – May 2026
May 2026
2.0 km away - New homes
7 new homes completedhouses · Mar 2026
Apr 2026
1.8 km away - New homes
6 new homes completedhouses · Jan 2025 – Apr 2026
Apr 2026
1.9 km away - New homes
14 new homes completedhouses · Jan 2026 – Mar 2026
Mar 2026
1.8 km away - New homes
9 new homes completedhouses · Oct 2025 – Feb 2026
Feb 2026
1.9 km away - New homes
9 new homes completedhouses · Nov 2025
Nov 2025
1.6 km away - New homes
24 new homes completedhouses · Dec 2024 – Nov 2025
Nov 2025
2.0 km away - New homes
32 new homes completedhouses · Mar 2025 – Oct 2025
Oct 2025
2.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 21 postcodes nearby had new homes completed in the last two years.
3homes extended 2021–2025, typically adding 113 m²
5since energy certificates began (2008)
2in NR9 3LA itself
- Extendedcertificate 2025
- Extendedcertificate 2022
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
38 planned, approved or being built and 8 running (18 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Mindful Snacker, Little Melton Food Park - Solar Photovoltaic SystemApproved, not yet built · 230 kW
Sept 2025
1.6 km away - Rooftop solar
Spire Norwich Hospital, Colney - Solar PanelsApproved, not yet built · 210 kW
Apr 2024
1.9 km away - Rooftop solar
Field Trials Station, Sparrows Hill - Solar PanelsApproved, not yet built · 340 kW
Apr 2026
1.9 km away - Solar farm
New Road Solar FarmBeing built · 5 MW
Dec 2016
2.0 km away - Rooftop solar
Costessey - Roof mounted solar panelApproved, not yet built · 200 kW
Apr 2022
3.8 km away - Rooftop solar
Bannatyne Health Club, Ernest Gage Avenue - Solar PanelsApproved, not yet built · 230 kW
Jul 2024
3.9 km away - Rooftop solar
Norwich Community Hospital, Bowthorpe Road - Solar panelsApproved, not yet built · 180 kW
Mar 2026
4.5 km away - Battery storage
Mulbarton Road, Keswick - Battery Energy Storage SystemPlanning application in · 400 MW
Jul 2025
5.7 km away - Battery storage
Hornsea Project Three - Battery StorageBeing built · 300 MW
Dec 2025
5.9 km away - Rooftop solar
Sainsburys Supermarkets, Brazen Gate - Solar PanelsApproved, not yet built · 310 kW
Jun 2025
6.1 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2022
2.5 km away - Recommendation
Norwich to TilburyElectric Lines · Reinforcement of the electricity transmission network between Norwich and Tilbury Substations application due August 2025
7.1 km away - Decideddecided Apr 2024
7.8 km away - Decideddecided Aug 2022
8.6 km away - Decideddecided Jun 2015
9.9 km away - Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Costessey Landfill Gas Project 2 (landfill gas, 3.5 km); Briar Solar Farm (solar farm, 4.8 km); The Everest System (battery storage, 6.6 km); Land East of White Horse Lane (solar farm, 7.4 km); Land south of Brick Kiln Road (solar farm, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.