Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Cringleford, Little Melton & Easton: +18% over five years (2020 → 2025).
Council tax list: 780 homes added in the neighbourhood since April 2024.
Population (GP registrations): +13.1% in two years.
12 new homes completedhouses · Jun 2025 – Oct 2025
Oct 2025 1.5 km away
New homes
12 new homes completedhouses · Jun 2025 – Sep 2025
Sept 2025 1.4 km away
New homes
8 new homes completedhouses · Mar 2025 – Jun 2025
Jun 2025 1.3 km away
New homes
5 new homes completedhouses · May 2025
May 2025 1.4 km away
New homes
7 new homes completedhouses · Mar 2025 – May 2025
May 2025 1.4 km away
New homes
17 new homes completedhouses · Oct 2024 – Mar 2025
Mar 2025 1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 30 postcodes nearby had new homes completed in the last two years.
Battery storage
Bracon Ash SolarBeing built
Nov 2023 6.2 km away
Solar farm
Bracon Ash SolarBeing built · 29 MW
Nov 2023 6.2 km away
Running nearest: Costessey Landfill Gas Project 2 (landfill gas, 3.9 km); Briar Solar Farm (solar farm, 5.5 km); The Everest System (battery storage, 6.1 km); Land East of White Horse Lane (solar farm, 7.8 km); Land south of Brick Kiln Road (solar farm, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
application due March 2027 29.4 km away
Pre-application
High Grove SolarGenerating Stations · The proposals are situated within the Breckland District Council area of Norfolk, located approximately 17km west of Norwich and 1km west of Dereham.
application due October 2026 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.