Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
51hours of spills in 2025 between them (typical neighbourhood: about 36)
35spill events counted
Anglian Water
Norwich - Ketts Hill Csointo River Wensum35 spills, 51 hours in 2025
1.9 km away
Anglian Water
Norwich Cow Tower Csointo River Wensum0 spills, 0 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 26 postcodes nearby had new homes completed in the last two years.
Solar farm
White Horse Lane (Trowse) - Phase 2Approved, not yet built · 9 MW
Sept 2021 4.5 km away
Rooftop solar
Wendover Road, Rackheath - Solar PanelsApproved, not yet built · 280 kW
Dec 2021 4.5 km away
Running nearest: Land East of White Horse Lane (solar farm, 4.5 km); Briar Solar Farm (solar farm, 5.1 km); Salhouse Solar Farm (solar farm, 6.9 km); Avenue Farm (solar farm, 8.2 km); Costessey Landfill Gas Project 2 (landfill gas, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Plumstead Road East, NorwichUtility repair and maintenance works · ANGLIAN WATER · Two-way signals
Nov 2026 to Nov 2026 350 m away
Minor
Furze Road, Thorpe St AndrewUtility asset works · BT · Temp obstruction 15 minute delay
Oct 2026 to Oct 2026 650 m away
Minor
Pilling Road, Thorpe St AndrewUtility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 16.5 km away
Decided
Great Yarmouth Third River Crossing Highways · A new highway crossing of River Yare, Great Yarmouth, connecting Harfrey’s Roundabout to the west of
decided Sept 2020 27.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.