Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
18 new homes completedhouses · Mar 2025 – Dec 2025
Dec 2025 1.2 km away
New homes
32 new homes completedhouses · Nov 2024 – Aug 2025
Aug 2025 850 m away
New homes
10 new homes completedhouses · Jul 2025
Aug 2025 750 m away
New homes
10 new homes completedhouses · Jun 2025 – Aug 2025
Aug 2025 1.2 km away
New homes
33 new homes completedhouses · Apr 2025 – Jun 2025
Jun 2025 750 m away
New homes
9 new homes completedhouses · Jan 2025 – Apr 2025
Apr 2025 150 m away
New homes
8 new homes completedhouses · Dec 2024 – Feb 2025
Feb 2025 850 m away
New homes
7 new homes completedhouses · Dec 2024 – Feb 2025
Feb 2025 150 m away
New homes
6 new homes completedhouses · Oct 2024 – Feb 2025
Feb 2025 450 m away
New homes
7 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025 1.3 km away
New homes
13 new homes completedhouses · Oct 2024 – Dec 2024
Dec 2024 900 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 33 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Sainsburys Supermarkets, Brazen Gate - Solar PanelsApproved, not yet built · 310 kW
Jun 2025 4.9 km away
Solar farm
White Horse Lane (Trowse) - Phase 2Approved, not yet built · 9 MW
Sept 2021 5.6 km away
Running nearest: Salhouse Solar Farm (solar farm, 5.6 km); Land East of White Horse Lane (solar farm, 5.6 km); Briar Solar Farm (solar farm, 6.0 km); Avenue Farm (solar farm, 8.6 km); Mayton Wood Landfill Site (landfill gas, 10.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 17.6 km away
Decided
Great Yarmouth Third River Crossing Highways · A new highway crossing of River Yare, Great Yarmouth, connecting Harfrey’s Roundabout to the west of
decided Sept 2020 26.3 km away
Pre-application
Suffolk Water Recycling Transfer and StorageTransfer of Water Resources · The project is located in East Anglia and covers a wide area given its linear nature. The
are a number of above ground assets alongside buried pipelines as represented in the
graphic below.
application due April 2028 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.