Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Burtt Way, Great Plumstead - Solar Battery StorageApproved, not yet built · 300 kW
Dec 2023 4.5 km away
Rooftop solar
John Menzies Distribution, Memorial Way - Solar PV PanelsApproved, not yet built · 190 kW
Jan 2023 4.6 km away
Running nearest: Briar Solar Farm (solar farm, 4.1 km); Land East of White Horse Lane (solar farm, 5.7 km); Salhouse Solar Farm (solar farm, 6.7 km); Costessey Landfill Gas Project 2 (landfill gas, 8.3 km); Mayton Wood Landfill Site (landfill gas, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 18.0 km away
Decided
Great Yarmouth Third River Crossing Highways · A new highway crossing of River Yare, Great Yarmouth, connecting Harfrey’s Roundabout to the west of
decided Sept 2020 28.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.