What's changing near NR7 0JA
Within 2 km, around Thorpe St Andrew North in Broadland. Building, planning, schools, transport, prices and crime.
298new homes completed within 2 km, last 2 years
14homes given permission on brownfield sites since 2021
+1.1%like-for-like prices in Thorpe St Andrew North, 2024 → 2025 (council +0.4%)
-22%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
2.0 km away - New homes
14 new homes completedhouses · Feb 2025 – Sep 2026
Sept 2026
1.6 km away - New homes
10 new homes completedhouses · Jul 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
22 new homes completedhouses · Jan 2025 – Sep 2026
Sept 2026
1.3 km away - New homes
8 new homes completedhouses · Aug 2026
Aug 2026
1.4 km away - New homes
25 new homes completedflats · Jan 2026 – Jul 2026
Jul 2026
1.5 km away - New homes
11 new homes completedhouses · Aug 2025 – Jul 2026
Jul 2026
1.4 km away - New homes
35 new homes completedhouses · Dec 2024 – Jun 2026
Jun 2026
1.4 km away - New homes
6 new homes completedhouses · Jan 2026 – Apr 2026
Apr 2026
1.4 km away - New homes
26 new homes completedhouses · Aug 2025 – Mar 2026
Mar 2026
1.9 km away - New homes
32 new homes completedhouses · Nov 2024 – Aug 2025
Aug 2025
1.9 km away - New homes
10 new homes completedhouses · Jul 2025
Aug 2025
1.8 km away
20homes extended 2021–2025, typically adding 25 m²
51since energy certificates began (2008)
4in NR7 0JA itself
- Extendedcertificate 2024
- Extendedcertificate 2018
- Extendedcertificate 2016
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
29 planned, approved or being built and 4 running (19 MW between them). Those within 5 km are on the map above.
- Battery storage
Burtt Way, Great Plumstead - Solar Battery StorageApproved, not yet built · 300 kW
Dec 2023
2.2 km away - Rooftop solar
John Menzies Distribution, Memorial Way - Solar PV PanelsApproved, not yet built · 190 kW
Jan 2023
2.2 km away - Rooftop solar
D And F Mccarthy Limited, Memorial Way - Solar PanelsApproved, not yet built · 310 kW
Mar 2024
2.3 km away - Rooftop solar
Tesco Stores - Solar PanelsApproved, not yet built · 330 kW
Nov 2025
2.4 km away - Rooftop solar
W M Morrisons Supermarkets Plc, Albion Way - Solar Generating SystemApproved, not yet built · 860 kW
Feb 2024
2.8 km away - Rooftop solar
John Lewis, All Saints Green - Solar PanelsApproved, not yet built · 240 kW
Mar 2025
3.5 km away - Biomass
John Youngs Limited, City Road - Biomass BoilerApproved, not yet built · 200 kW
Apr 2023
3.5 km away - Rooftop solar
Chantry Place, St Stephens Street - Solar PanelsApproved, not yet built · 150 kW
May 2023
3.7 km away - Rooftop solar
Sainsburys Supermarkets, Brazen Gate - Solar PanelsApproved, not yet built · 310 kW
Jun 2025
4.0 km away - Solar farm
White Horse Lane (Trowse) - Phase 2Approved, not yet built · 9 MW
Sept 2021
4.5 km away
Road and street works within 1 km
9 permitted works running now or planned, 4 of them major.
- Major, planned
South Hill Road, Thorpe St AndrewHighway repair and maintenance works · NORFOLK COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
550 m away - Major
South Hill Road, Thorpe St AndrewHighway repair and maintenance works · NORFOLK COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
550 m away - Major, planned
Gordon Avenue, Thorpe St AndrewUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Sept 2026 to Nov 2026
800 m away - Major
Gordon Avenue, Thorpe St AndrewUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Sept 2026 to Nov 2026
800 m away - Standard
Pilling Road, Thorpe St AndrewUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026
800 m away - Standard
Margetson Avenue, Thorpe St AndrewUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Nov 2026
1000 m away - Minor
Furze Road, Thorpe St AndrewUtility asset works · BT · Temp obstruction 15 minute delay
Oct 2026 to Oct 2026
150 m away - Minor
Plumstead Road East, NorwichUtility repair and maintenance works · ANGLIAN WATER · Two-way signals
Nov 2026 to Nov 2026
650 m away - Minor
Pilling Road, Thorpe St AndrewUtility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026
750 m away
Major infrastructure projects within 30 km
- Decideddecided Jun 2015
2.2 km away - Recommendation
Norwich to TilburyElectric Lines · Reinforcement of the electricity transmission network between Norwich and Tilbury Substations application due August 2025
8.6 km away - Decideddecided Oct 2022
9.1 km away - Decideddecided Jun 2022
9.4 km away - Decideddecided Apr 2024
9.6 km away - Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Land East of White Horse Lane (solar farm, 4.5 km); Briar Solar Farm (solar farm, 5.7 km); Salhouse Solar Farm (solar farm, 6.8 km); Avenue Farm (solar farm, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.