Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
44hours of spills in 2025 between them (typical neighbourhood: about 36)
16spill events counted
Anglian Water
Drayton Rd No 3/Bootbinder Road Csointo The River Wensum16 spills, 44 hours in 2025
Burtt Way, Great Plumstead - Solar Battery StorageApproved, not yet built · 300 kW
Dec 2023 5.2 km away
Rooftop solar
Wendover Road, Rackheath - Solar PanelsApproved, not yet built · 280 kW
Dec 2021 5.3 km away
Running nearest: Briar Solar Farm (solar farm, 3.1 km); Land East of White Horse Lane (solar farm, 5.4 km); Costessey Landfill Gas Project 2 (landfill gas, 7.3 km); Salhouse Solar Farm (solar farm, 7.6 km); Reepham Road (Waste AD) (anaerobic digestion, 8.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 17.7 km away
Decided
Great Yarmouth Third River Crossing Highways · A new highway crossing of River Yare, Great Yarmouth, connecting Harfrey’s Roundabout to the west of
decided Sept 2020 29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.