Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
New-home postcodes with fewer than 5 homes are counted above but not listed. 21 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Sainsburys Supermarkets, Brazen Gate - Solar PanelsApproved, not yet built · 310 kW
Jun 2025 5.0 km away
Biomass
John Youngs Limited, City Road - Biomass BoilerApproved, not yet built · 200 kW
Apr 2023 5.2 km away
Running nearest: Briar Solar Farm (solar farm, 4.2 km); Salhouse Solar Farm (solar farm, 6.6 km); Land East of White Horse Lane (solar farm, 6.8 km); Costessey Landfill Gas Project 2 (landfill gas, 7.9 km); Mayton Wood Landfill Site (landfill gas, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 19.1 km away
Decided
Great Yarmouth Third River Crossing Highways · A new highway crossing of River Yare, Great Yarmouth, connecting Harfrey’s Roundabout to the west of
decided Sept 2020 29.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.