Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Spire Norwich Hospital, Colney - Solar PanelsApproved, not yet built · 210 kW
Apr 2024 5.1 km away
Solar farm
Burgate Solar FarmApproved, not yet built · 15 MW
Aug 2021 5.4 km away
Running nearest: Briar Solar Farm (solar farm, 2.2 km); Costessey Landfill Gas Project 2 (landfill gas, 5.5 km); Reepham Road (Waste AD) (anaerobic digestion, 6.4 km); Land East of White Horse Lane (solar farm, 6.8 km); Spring Farm (biomass) (anaerobic digestion, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major, planned
Sutherland Avenue, HellesdonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 600 m away
Standard
Mountfield Avenue, HellesdonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
Minor
Middletons Lane, HellesdonUtility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 18.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.