Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
73hours of spills in 2025 between them (typical neighbourhood: about 36)
31spill events counted
Anglian Water
Drayton Rd No 3/Bootbinder Road Csointo The River Wensum16 spills, 44 hours in 2025
750 m away
Anglian Water
Gibraltar Gardens Csointo The River Wensum8 spills, 28 hours in 2025
800 m away
Anglian Water
Norwich Angel Road Csointo The River Wensum7 spills, 1 hours in 2025
1.3 km away
Anglian Water
Norwich Dereham Road Ssointo River Wensum0 spills, 0 hours in 2025
850 m away
Anglian Water
Norwich Oak Lane Csointo The River Wensum0 spills, 0 hours in 2025
1.3 km away
Anglian Water
Norwich - New Mills Csointo River Wensum0 spills, 0 hours in 2025
Glebe Horsford - Solar FarmApproved, not yet built · 18 MW
Jul 2025 4.6 km away
Solar farm
White Horse Lane (Trowse) - Phase 2Approved, not yet built · 9 MW
Sept 2021 5.1 km away
Running nearest: Briar Solar Farm (solar farm, 1.5 km); Land East of White Horse Lane (solar farm, 5.1 km); Costessey Landfill Gas Project 2 (landfill gas, 5.8 km); Reepham Road (Waste AD) (anaerobic digestion, 7.8 km); Spring Farm (biomass) (anaerobic digestion, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Drayton Road, NorwichUtility repair and maintenance works · ANGLIAN WATER · No carriageway incursion
Oct 2026 to Oct 2026 550 m away
Minor
Drayton Road, NorwichUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 700 m away
Minor
Civic Gardens, NorwichUtility repair and maintenance works · ANGLIAN WATER · Temp obstruction 15 minute delay
Jan 2027 to Jan 2027 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 17.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.