Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
720hours of spills in 2025 between them (typical neighbourhood: about 36)
114spill events counted
Anglian Water
Elm Hill Overflowinto Wensum Ds Norwich70 spills, 643 hours in 2025
1.6 km away
Anglian Water
Drayton Rd No 3/Bootbinder Road Csointo The River Wensum16 spills, 44 hours in 2025
350 m away
Anglian Water
Gibraltar Gardens Csointo The River Wensum8 spills, 28 hours in 2025
200 m away
Anglian Water
Norwich - River Lane Csointo River Wensum6 spills, 2 hours in 2025
1.7 km away
Anglian Water
School Lane / Bedford Street Csointo The River Wensum4 spills, 1 hours in 2025
1.4 km away
Anglian Water
Norwich - Barrack Street Csointo River Wensum3 spills, 1 hours in 2025
1.6 km away
Anglian Water
Norwich Angel Road Csointo The River Wensum7 spills, 1 hours in 2025
700 m away
Anglian Water
Norwich Dereham Road Ssointo River Wensum0 spills, 0 hours in 2025
Tesco Stores - Solar PanelsApproved, not yet built · 330 kW
Nov 2025 4.4 km away
Battery storage
Mulbarton Road, Keswick - Battery Energy Storage SystemPlanning application in · 400 MW
Jul 2025 4.9 km away
Running nearest: Briar Solar Farm (solar farm, 1.5 km); Land East of White Horse Lane (solar farm, 4.3 km); Costessey Landfill Gas Project 2 (landfill gas, 5.8 km); Reepham Road (Waste AD) (anaerobic digestion, 8.4 km); Spring Farm (biomass) (anaerobic digestion, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Drayton Road, NorwichUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 16.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.