Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
28hours of spills in 2025 between them (typical neighbourhood: about 36)
8spill events counted
Anglian Water
Gibraltar Gardens Csointo The River Wensum8 spills, 28 hours in 2025
1.9 km away
Anglian Water
Norwich Dereham Road Ssointo River Wensum0 spills, 0 hours in 2025
1.9 km away
Anglian Water
Norwich - New Mills Csointo River Wensum0 spills, 0 hours in 2025
A47 North Tuddenham to Easton Highways · The scheme commences east of North Tuddenham and continues to the Easton roundabout.
decided Aug 2022 11.9 km away
Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in University & Avenues: +20% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -4.2% in two years.
Klyne Business Aviation Centre, Buck Courtney Crescent - Solar PanelsApproved, not yet built · 500 kW
Sept 2023 5.0 km away
Rooftop solar
Fluke Calibration, Hurricane Way - Solar PanelsApproved, not yet built · 480 kW
Dec 2024 5.6 km away
Running nearest: Briar Solar Farm (solar farm, 2.1 km); Land East of White Horse Lane (solar farm, 3.9 km); Costessey Landfill Gas Project 2 (landfill gas, 5.3 km); Land south of Brick Kiln Road (solar farm, 8.2 km); The Everest System (battery storage, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.