Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
2hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
Anglian Water
School Lane / Bedford Street Csointo The River Wensum4 spills, 1 hours in 2025
1.7 km away
Anglian Water
Norwich Angel Road Csointo The River Wensum7 spills, 1 hours in 2025
1.9 km away
Anglian Water
Norwich - New Mills Csointo River Wensum0 spills, 0 hours in 2025
1.5 km away
Anglian Water
Norwich - Elm Hill Csointo River Wensum0 spills, 0 hours in 2025
1.9 km away
Anglian Water
Norwich Oak Lane Csointo The River Wensum0 spills, 0 hours in 2025
Klyne Business Aviation Centre, Buck Courtney Crescent - Solar PanelsApproved, not yet built · 500 kW
Sept 2023 5.4 km away
Solar farm
New Road Solar FarmBeing built · 5 MW
Dec 2016 5.4 km away
Running nearest: Briar Solar Farm (solar farm, 2.7 km); Land East of White Horse Lane (solar farm, 3.0 km); Costessey Landfill Gas Project 2 (landfill gas, 6.2 km); Land south of Brick Kiln Road (solar farm, 8.0 km); The Everest System (battery storage, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Earlham Road, NorwichUtility asset works · CADENT GAS LIMITED · Two-way signals
Nov 2026 to Nov 2026 1000 m away
Minor
Christchurch Road, NorwichUtility asset works · BT · Multi-way signals
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 14.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.