Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Norwich to TilburyElectric Lines · Reinforcement of the electricity transmission network between Norwich and Tilbury Substations
application due August 2025 14.2 km away
Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Lays Farm, Wood Lane - Solar PanelsApproved, not yet built · 230 kW
Oct 2022 8.2 km away
Rooftop solar
Mindful Snacker, Little Melton Food Park - Solar Photovoltaic SystemApproved, not yet built · 230 kW
Sept 2025 8.8 km away
Running nearest: Hardingham Solar Farm (solar farm, 3.3 km); Hardingham Solar Farm - extension (solar farm, 3.4 km); Rookery Business Park (solar farm, 4.9 km); Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion (anaerobic digestion, 7.9 km); The Everest System (battery storage, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided Jun 2015 20.2 km away
Pre-application
High Grove SolarGenerating Stations · The proposals are situated within the Breckland District Council area of Norfolk, located approximately 17km west of Norwich and 1km west of Dereham.
application due October 2026 22.4 km away
Pre-application
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
The Droves Solar FarmGenerating Stations · 800m north of Swaffham and 800m south west of Castle Acre, West Norfolk
application due 19 November 2025 28.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.