Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
4hours of spills in 2025 between them (typical neighbourhood: about 36)
2spill events counted
Anglian Water
Carvers La Terminal Spsinto Tributary River Thet2 spills, 4 hours in 2025
1.8 km away
Anglian Water
Attleborough Psinto Buckenham Stream0 spills, 0 hours in 2025
950 m away
Anglian Water
Attleborough Wrcinto Tributary River Thet0 spills, 0 hours in 2025
5 planned, approved or being built and 5 running (63 MW between them). Those within 5 km are on the map above.
Solar farm
Land North of the A11 - Solar ParkApproved, not yet built · 1 MW
Oct 2022 1.4 km away
Solar farm
Attleborough Road Solar FarmBeing built · 30 MW
Dec 2022 2.4 km away
Solar farm
Hargham Road - Solar PanelsPlanning application in · 250 kW
Mar 2024 3.5 km away
Rooftop solar
IFD Group, Harling Road - Solar PanelsApproved, not yet built · 250 kW
Feb 2023 4.8 km away
Rooftop solar
Lays Farm, Wood Lane - Solar PanelsApproved, not yet built · 230 kW
Oct 2022 4.8 km away
Running nearest: Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion (anaerobic digestion, 1.5 km); Snetterton Biomass Plant (biomass, 4.2 km); Airfield Farm PV (solar farm, 4.8 km); Rookery Business Park (solar farm, 5.7 km); Kenninghall Solar / Hazeldick Solar (solar farm, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
1 permitted works running now or planned.
Minor
Dodds Road, AttleboroughUtility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
A47 - A11 Thickthorn Junction Highways · A47 and A11 Thickthorn Interchange approximately 5.5km south west of Norwich City Centre
decided Oct 2022 18.6 km away
Decided
A47 North Tuddenham to Easton Highways · The scheme commences east of North Tuddenham and continues to the Easton roundabout.
decided Aug 2022 19.1 km away
Pre-application
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
Norwich to TilburyElectric Lines · Reinforcement of the electricity transmission network between Norwich and Tilbury Substations
application due August 2025 20.1 km away
Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Attleborough: +18% over five years (2020 → 2025).
Council tax list: 240 homes added in the neighbourhood since April 2024.
Population (GP registrations): +4.7% in two years.
High Grove SolarGenerating Stations · The proposals are situated within the Breckland District Council area of Norfolk, located approximately 17km west of Norwich and 1km west of Dereham.
The Droves Solar FarmGenerating Stations · 800m north of Swaffham and 800m south west of Castle Acre, West Norfolk
application due 19 November 2025 29.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.