Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
8 planned, approved or being built and 5 running (63 MW between them). Those within 5 km are on the map above.
Solar farm
Attleborough Road Solar FarmBeing built · 30 MW
Dec 2022 4.1 km away
Solar farm
Hargham Road - Solar PanelsPlanning application in · 250 kW
Mar 2024 6.0 km away
Solar farm
Land North of the A11 - Solar ParkApproved, not yet built · 1 MW
Oct 2022 7.5 km away
Battery storage
Market Lane And Carr Lane, Great Moulton - Battery Energy Storage SystemPlanning application in · 400 MW
Jun 2025 7.5 km away
Rooftop solar
IFD Group, Harling Road - Solar PanelsApproved, not yet built · 250 kW
Feb 2023 7.7 km away
Solar farm
Farmers Industrial Estate,Mill Road - Solar PV SystemsApproved, not yet built · 1 MW
Apr 2024 8.3 km away
Solar farm
Station Road, Tivetshall St Margaret - Solar PV PanelsApproved, not yet built · 20 MW
Jun 2025 8.9 km away
Battery storage
Hill Farm, Wacton Road - Battery Energy Storage SystemApproved, not yet built · 120 MW
Mar 2026 9.1 km away
Running nearest: Rookery Business Park (solar farm, 7.0 km); Kenninghall Solar / Hazeldick Solar (solar farm, 7.1 km); Attleborough Ad Plant Limited - Anaerobic Digestion Facility Expansion (anaerobic digestion, 7.5 km); Snetterton Biomass Plant (biomass, 8.0 km); Airfield Farm PV (solar farm, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
Major, planned
Marsh Lane, New BuckenhamUtility asset works · BT · Road closure
Nov 2026 to Dec 2026 200 m away
Major
Marsh Lane, New BuckenhamUtility asset works · BT · Road closure
Nov 2026 to Dec 2026 200 m away
Standard
King Street, New BuckenhamUtility asset works · BT · Some carriageway incursion
Nov 2026 to Dec 2026 200 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
application due March 2027 13.7 km away
Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
High Grove SolarGenerating Stations · The proposals are situated within the Breckland District Council area of Norfolk, located approximately 17km west of Norwich and 1km west of Dereham.
application due October 2026 29.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.