Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
12 planned, approved or being built and 1 running (700 kW between them). Those within 5 km are on the map above.
Solar farm
Station Road, Tivetshall St Margaret - Solar PV PanelsApproved, not yet built · 20 MW
Jun 2025 150 m away
Solar farm
Semere Lane, Dickleburgh - Solar FarmPlanning application in · 50 MW
Jul 2025 3.1 km away
Solar farm
Farmers Industrial Estate,Mill Road - Solar PV SystemsApproved, not yet built · 1 MW
Apr 2024 4.3 km away
Battery storage
Market Lane And Carr Lane, Great Moulton - Battery Energy Storage SystemPlanning application in · 400 MW
Jun 2025 4.3 km away
Solar farm
East Pye Solar FarmPlanning application in · 500 MW
Apr 2026 5.7 km away
Battery storage
East Pye Solar FarmPlanning application in
Apr 2026 5.7 km away
Battery storage
Hill Farm, Wacton Road - Battery Energy Storage SystemApproved, not yet built · 120 MW
Mar 2026 6.5 km away
Rooftop solar
Peddars Milling, Mill Road - Solar PanelsApproved, not yet built · 400 kW
Mar 2025 6.7 km away
Battery storage
Long Stratton Leisure Centre, Long Stratton - BatteryApproved, not yet built · 300 kW
Feb 2025 6.9 km away
Rooftop solar
Long Stratton Leisure Centre, Long Stratton - Solar PanelsApproved, not yet built · 140 kW
Feb 2025 6.9 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 9.8 km away
Pre-application
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.