Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
22storm overflows within 2 km
929hours of spills in 2025 between them (typical neighbourhood: about 36)
247spill events counted
Anglian Water
Elm Hill Overflowinto Wensum Ds Norwich70 spills, 643 hours in 2025
1.7 km away
Anglian Water
Norwich Cedar Road Csointo The River Wensum11 spills, 96 hours in 2025
550 m away
Anglian Water
Trowse Terminal Pumping Stationinto The River Yare15 spills, 52 hours in 2025
900 m away
Anglian Water
Norwich - Ketts Hill Csointo River Wensum35 spills, 51 hours in 2025
1.9 km away
Anglian Water
Norwich Sandy Lane Csointo The River Yare24 spills, 36 hours in 2025
1.5 km away
Anglian Water
King Street Combined Sewer Overflowinto The River Wensum26 spills, 25 hours in 2025
850 m away
Anglian Water
Norwich - King Street #2 Csointo River Wensum20 spills, 9 hours in 2025
750 m away
Anglian Water
Norwich Lower Close (Ferry Ln) Csointo The River Wensum11 spills, 7 hours in 2025
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Lakenham & Tuckswood: +17% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.3% in two years.
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
Rooftop solar
D And F Mccarthy Limited, Memorial Way - Solar PanelsApproved, not yet built · 310 kW
Mar 2024 5.2 km away
Rooftop solar
Tesco Stores - Solar PanelsApproved, not yet built · 330 kW
Nov 2025 5.2 km away
Running nearest: Land East of White Horse Lane (solar farm, 1.5 km); Briar Solar Farm (solar farm, 4.2 km); Avenue Farm (solar farm, 7.5 km); Land south of Brick Kiln Road (solar farm, 8.1 km); Costessey Landfill Gas Project 2 (landfill gas, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Ber Street, NorwichUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away
Standard
Cecil Road, NorwichUtility repair and maintenance works · ANGLIAN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
Minor
Ber Street, NorwichNew service connection · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Oct 2026 350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
application due March 2026 13.7 km away
Decided
A47 North Tuddenham to Easton Highways · The scheme commences east of North Tuddenham and continues to the Easton roundabout.
decided Aug 2022 14.8 km away
Decided
Great Yarmouth Third River Crossing Highways · A new highway crossing of River Yare, Great Yarmouth, connecting Harfrey’s Roundabout to the west of
decided Sept 2020 28.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.