What's changing near NP26 4JA
Within 2 km, around Caldicot South in Monmouthshire. Building, planning, schools, transport, prices and crime.
112new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-4.0%like-for-like prices in Caldicot South, 2024 → 2025 (council +1.3%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
16 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
750 m away - New homes
40 new homes completed2 flats, 38 houses · Jan 2025 – Oct 2026
Oct 2026
850 m away - New homes
37 new homes completedhouses · Mar 2025 – Aug 2026
Aug 2026
800 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
1homes extended 2021–2025, typically adding 81 m²
4since energy certificates began (2008)
0in NP26 4JA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 20 running (191 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Newhouse Farm Industrial Estate, Unit 1 - Roof Mounted SolarApproved, not yet built · 280 kW
Jan 2026
5.6 km away - Wind farm
Abertillery - Wind farmPlanning application in · 40 MW
Oct 2024
7.6 km away - Battery storage
Abertillery - Wind farm - BatteryPlanning application in
Oct 2024
7.6 km away - Rooftop solar
Warburtons Bakery, Western Approach Distribution Park - Solar PanelsApproved, not yet built · 940 kW
Apr 2026
7.8 km away - Rooftop solar
Warburtons Bakery, Western Approach Distribution Park - Solar PanelsPlanning application in · 1 MW
May 2026
7.8 km away - Solar farm
Rush Wall Solar ParkAppeal lodged · 75 MW
Feb 2024
8.4 km away - Rooftop solar
Goldcrest Way - Solar PanelsApproved, not yet built · 720 kW
May 2026
8.4 km away - Rooftop solar
CHEP Severnside, Goldcrest Way - Solar PanelsApproved, not yet built · 470 kW
May 2024
8.4 km away - Wind farm
North Court Farm, Redwick - Wind TurbinePlanning application in · 4 MW
Jul 2023
8.5 km away - Solar farm
Central Park - Solar Farm & Battery StoragePlanning application in · 7 MW
Jan 2026
8.5 km away - Battery storage
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due November 2026
8.4 km away - Decideddecided Nov 2022
11.7 km away - Decideddecided Jan 2016
28.4 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
28.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Southbrook Solar Farm (solar farm, 1.4 km); Oak Grove Farm (solar farm, 2.8 km); Rhewl Farm (solar farm, 5.1 km); Land adjacent to Church Road (solar farm, 6.6 km); Avonmouth Port II (wind farm, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.