What's changing near NP26 3NU
Within 2 km, around Magor & Rogiet in Monmouthshire. Building, planning, schools, transport, prices and crime.
126new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.7%like-for-like prices in Magor & Rogiet, 2024 → 2025 (council +1.3%)
+8%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completed2 flats, 10 houses · Jun 2025 – Apr 2026
Apr 2026
350 m away - New homes
41 new homes completed13 flats, 28 houses · Jun 2025 – Apr 2026
Apr 2026
300 m away - New homes
5 new homes completed2 flats, 3 houses · Jan 2026 – Apr 2026
Apr 2026
350 m away - New homes
21 new homes completed15 flats, 6 houses · Mar 2026
Mar 2026
700 m away - New homes
11 new homes completedhouses · Mar 2026
Mar 2026
650 m away - New homes
12 new homes completedhouses · Mar 2025 – Nov 2025
Nov 2025
250 m away - New homes
12 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025
300 m away - New homes
10 new homes completedhouses · Oct 2024 – Jan 2025
Jan 2025
300 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 24 m²
23since energy certificates began (2008)
3in NP26 3NU itself
- Extendedcertificate 2024
- Extendedcertificate 2020
- Extendedcertificate 2019
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
8 planned, approved or being built and 11 running (129 MW between them). Those within 5 km are on the map above.
- Wind farm
Abertillery - Wind farmPlanning application in · 40 MW
Oct 2024
2.5 km away - Battery storage
Abertillery - Wind farm - BatteryPlanning application in
Oct 2024
2.5 km away - Wind farm
North Court Farm, Redwick - Wind TurbinePlanning application in · 4 MW
Jul 2023
3.6 km away - Solar farm
Rush Wall Solar ParkAppeal lodged · 75 MW
Feb 2024
3.9 km away - Biomass
Leeway Industrial Estate - Biomass boilerApproved, not yet built · 500 kW
May 2021
8.8 km away - Battery storage
Leeway House, Leeway Industrial Estate - Battery Energy Storage SystemApproved, not yet built · 21 MW
Jul 2025
8.8 km away - Battery storage
Uskmouth Power Station - Battery StorageBeing built · 230 MW
Nov 2023
9.6 km away - Battery storage
Uskmouth Power Station, West Nash Road - Battery Energy StorageApproved, not yet built
Oct 2025
9.6 km away
Running nearest: Longlands Farm, Rush Wall Lane (wind farm, 2.3 km); Court Farm (solar farm, 4.4 km); Llanwern Solar Farm & Battery Storage (solar farm, 6.1 km); Langstone Court Road Solar Farm (solar farm, 6.5 km); Southbrook Solar Farm (solar farm, 6.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due November 2026
4.0 km away - Decideddecided Nov 2022
11.6 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
27.0 km away - Decideddecided Jan 2016
27.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.