Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
146hours of spills in 2025 between them (typical neighbourhood: about 36)
21spill events counted
Anglian Water
Weedon Stwinto Trib Kislingbury Branch R Nene15 spills, 139 hours in 2025
1.4 km away
Anglian Water
Floreinto Trib River Nene6 spills, 7 hours in 2025
25 planned, approved or being built and 6 running (21 MW between them). Those within 5 km are on the map above.
Solar farm
Glassthorpe Hill, Flore - Solar FarmPlanning application in · 50 MW
Apr 2022 1.4 km away
Rooftop solar
Unipart Group, Cavalry Hill Industrial Park - Solar PanelsApproved, not yet built · 150 kW
Jan 2025 2.3 km away
Battery storage
Upper Heyford Roundabout, Daventry Link Road - Energy Storage SystemPlanning application in · 200 kW
Oct 2025 2.5 km away
Rooftop solar
Campion School, Kislingbury Road - Solar PanelsApproved, not yet built · 380 kW
May 2026 4.2 km away
Battery storage
Newnham Grange Farm - Battery Energy StoragePlanning application in · 15 MW
Jun 2025 5.0 km away
Rooftop solar
Sainsburys, Style Way - Solar PanelsPlanning application in · 5 MW
Jun 2026 6.4 km away
Solar farm
Danetre and Southbrook Learning Village, Hawke Road - Solar PV PanelsApproved, not yet built · 180 kW
Sept 2023 6.8 km away
Rooftop solar
Daventry Metal Products, Low March - Solar PanelsApproved, not yet built · 150 kW
Sept 2024 6.8 km away
Rooftop solar
White Barn Farm, Station Road - Solar PanelsApproved, not yet built · 360 kW
Dec 2024 7.1 km away
Battery storage
Welton Road - Energy Storage SystemApproved, not yet built · 200 kW
Nov 20257.5 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
East Haddon - Solar Photovoltaic SystemBeing built · 2 MW
Oct 2023 7.8 km away
Rooftop solar
Io Centre, Unit 5, 6, 7 & 8, Barn Way - Solar panelsApproved, not yet built · 250 kW
Feb 2025 8.0 km away
Running nearest: Weston Landfill Site (landfill gas, 2.8 km); Land to the south of Hill Farm (solar farm, 6.3 km); Nectar Way Regional Distribution Centre (rooftop solar, 6.6 km); Royal Oak Way South - Solar Array (solar farm, 8.8 km); Daventry (biomass, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Land to the south and west of Wellingborough and north of Northampton.
decided Oct 2026 22.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.