Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
115hours of spills in 2025 between them (typical neighbourhood: about 36)
61spill events counted
Anglian Water
Grendon Stwinto River Chater33 spills, 84 hours in 2025
450 m away
Anglian Water
Sso Lower Endinto Grendon Brook27 spills, 31 hours in 2025
150 m away
Anglian Water
Grendon Half Mooninto Grendon Brook1 spills, 0 hours in 2025
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire
decided Mar 2019 24.1 km away
Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Irchester, Wollaston & Bozeat: +21% over five years (2020 → 2025).
Council tax list: 140 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.6% in two years.
Beckworth Emporiun Anaerobic Digester PlantPlanning application in
Dec 2020 8.4 km away
Solar farm
Gooseys Lodge, Wymington Lane - Solar FarmApproved, not yet built · 10 MW
May 2024 8.4 km away
Running nearest: Wellingborough Solar Farm (solar farm, 4.6 km); London Road, Irchester - Solar Farm (solar farm, 4.9 km); Little Irchester, Higham Road Solar Farm (solar farm, 6.5 km); Airfield Farm (Podington) (wind farm, 6.7 km); Hyde Farm (solar farm, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due July 2027 30.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.