Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
16hours of spills in 2025 between them (typical neighbourhood: about 36)
9spill events counted
Anglian Water
Yardley Hastings Stwinto Grendon Brook8 spills, 15 hours in 2025
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire
decided Mar 2019 22.1 km away
Recommendation
East Park EnergyGenerating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station.
application due September 2025 24.5 km away
Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Cogenhoe, Hackleton & Denton: +21% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.9% in two years.
Octagon Way, Weston Favell Retail Park - Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025 8.9 km away
Rooftop solar
Sainsburys Store And Petrol, Northampton Road - Solar PanelsApproved, not yet built · 240 kW
Feb 2024 9.6 km away
Running nearest: Hyde Farm (solar farm, 4.0 km); Land East of Horton Road (solar farm, 4.1 km); Manor Farm (Horton) (solar farm, 4.6 km); Salcey Solar Farm (solar farm, 6.8 km); Bulls Head Farm North (solar farm, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due July 2027 28.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.