2new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.5%like-for-like prices in Earls Barton & Great Doddington, 2024 → 2025 (council +2.1%)
0%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 25 m²
21since energy certificates began (2008)
0in NN6 0ND itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
48hours of spills in 2025 between them (typical neighbourhood: about 36)
27spill events counted
- Anglian Water
Earls Barton Tpsinto River Nene23 spills, 43 hours in 2025
1.6 km away - Anglian Water
Mears Ashby Main Psinto Swanspool Brook4 spills, 5 hours in 2025
1.9 km away - Anglian Water
Station Rd Sso E Bartoninto Trib River Nene0 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
21 planned, approved or being built and 9 running (55 MW between them). Those within 5 km are on the map above.
- Battery storage
Grendon Road, Earls Barton - Battery Energy Storage SystemApproved, not yet built · 100 MW
Mar 2026
1.3 km away - Battery storage
Grendon Lakes, Grendon - Battery Storage FacilityApproved, not yet built · 50 MW
Jul 2025
3.0 km away - Solar farm
Green Hill Solar Farm & Battery StoragePlanning application in · 600 MW
Jun 2025
3.1 km away - Battery storage
Green Hill Solar Farm & Battery StoragePlanning application in · 600 MW
Jun 2025
3.1 km away - Rooftop solar
Sainsburys Store And Petrol, Northampton Road - Solar PanelsApproved, not yet built · 240 kW
Feb 2024
3.7 km away - Rooftop solar
Huxley Close - Solar PV SystemApproved, not yet built · 180 kW
Oct 2023
4.1 km away - Anaerobic digestion
Beckworth Emporiun Anaerobic Digester PlantPlanning application in
Dec 2020
4.6 km away - Battery storage
Site K2, Sywell Road - Battery StorageApproved, not yet built · 200 kW
Jul 2025
5.2 km away - Battery storage
Trinity Centre, Sinclair Drive - Energy Storage SystemApproved, not yet built · 200 kW
Feb 2026
5.5 km away - Battery storage
Octagon Way, Weston Favell Retail Park - Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025
5.9 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Green Hill Solar FarmGenerating Stations · Land to the south and west of Wellingborough and north of Northampton. decided Oct 2026
2.8 km away - Decideddecided Oct 2019
14.0 km away - Recommendation
East Park EnergyGenerating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station. application due September 2025
24.8 km away - Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton. application due July 2027
26.7 km away - Decideddecided Oct 2011
27.8 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wellingborough Solar Farm (solar farm, 4.3 km); Sywell Road (solar farm, 4.7 km); London Road, Irchester - Solar Farm (solar farm, 5.7 km); Little Irchester, Higham Road Solar Farm (solar farm, 7.1 km); Land East of Horton Road (solar farm, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.