What's changing near NG9 8JH
Within 2 km, around Stapleford North in Broxtowe. Building, planning, schools, transport, prices and crime.
190new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.1%like-for-like prices in Stapleford North, 2024 → 2025 (council +4.0%)
-12%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
34 new homes completedhouses · Dec 2025 – Oct 2026
planned Oct 2026
950 m away - New homes
8 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
950 m away - New homes
11 new homes completedhouses · Aug 2026 – Sep 2026
Sept 2026
750 m away - New homes
29 new homes completedhouses · Nov 2024 – Aug 2026
Aug 2026
150 m away - New homes
7 new homes completedhouses · Dec 2025 – Jul 2026
Jul 2026
250 m away - New school
New school: Hemlock Stone SchoolOther independent special school, other independent special school
Mar 2026
1.4 km away - New homes
12 new homes completedhouses · Nov 2024 – Oct 2025
Oct 2025
150 m away - New homes
13 new homes completed4 flats, 9 houses · Sep 2025
Oct 2025
1.0 km away - New homes
30 new homes completedhouses · Nov 2024 – Oct 2025
Oct 2025
1.1 km away - New homes
10 new homes completedhouses · Jun 2025 – Sep 2025
Sept 2025
200 m away - New homes
9 new homes completedhouses · Jul 2025
Jul 2025
1.3 km away - New homes
5 new homes completed2 flats, 3 houses · May 2025
May 20251.0 km away
5homes extended 2021–2025, typically adding 32 m²
11since energy certificates began (2008)
1in NG9 8JH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
572hours of spills in 2025 between them (typical neighbourhood: about 36)
122spill events counted
- Severn Trent Water
Gallows Inn Combined Sewer Overflowinto River Erewash31 spills, 239 hours in 2025
1.9 km away - Severn Trent Water
Pasture Lock Csointo Tributary Of Erewash Canal52 spills, 210 hours in 2025
1.3 km away - Severn Trent Water
Ilkeston (Hallam Fields) Wwtwinto River Erewash29 spills, 96 hours in 2025
1.2 km away - Severn Trent Water
Stapleford Phase 1 Csointo River Erewash10 spills, 27 hours in 2025
900 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
51 planned, approved or being built and 10 running (16 MW between them). Those within 5 km are on the map above.
- Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
2.0 km away - Rooftop solar
Crompton Road - Solar PanelsApproved, not yet built · 400 kW
May 2022
2.0 km away - Solar farm
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in · 16 MW
Feb 2025
2.1 km away - Battery storage
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in
Feb 2025
2.1 km away - Rooftop solar
Donaldson Timber, Hallam Fields Road - Solar PanelsApproved, not yet built · 240 kW
Mar 2025
2.1 km away - Rooftop solar
George Spencer Academy, Arthur Mee Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
2.4 km away - Rooftop solar
Hadden Court, Glaisdale Parkway - Roof Mounted Solar PanelsApproved, not yet built · 330 kW
Nov 2024
3.2 km away - Rooftop solar
Glaisdale Point, Units 10 To 12 - Roof Mounted Solar PV ArrayApproved, not yet built · 270 kW
Feb 2025
3.2 km away - Rooftop solar
Harvey Hadden Sports Village, Wigman Road - Solar PanelsApproved, not yet built · 300 kW
Feb 2025
4.2 km away - Rooftop solar
Bluecoat Beechdale Academy, Harvey Road - Solar PanelsApproved, not yet built · 320 kW
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major, planned
Hickings Lane, StaplefordHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Jan 2027 to Feb 2027
500 m away - Standard
Hickings Lane, StaplefordCore Sampling · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
500 m away - Standard
Pasture Road, StaplefordWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Stop/go boards
Dec 2026 to Dec 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
11.6 km away - RecommendationSept 2026
11.6 km away - RecommendationSept 2026
13.9 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
15.3 km away - Decideddecided Aug 2023
15.6 km away - Decideddecided Dec 2014
20.9 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 1.5 km); Beeston Weir Hydro Scheme (hydro, 5.2 km); Manners Avenue - Solar Panels (rooftop solar, 5.2 km); Willow Road - Roof mounted solar panels (rooftop solar, 6.1 km); Newthorpe Wind Turbine (wind farm, 6.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.