What's changing near NG9 7JJ
Within 2 km, around Stapleford South in Broxtowe. Building, planning, schools, transport, prices and crime.
135new homes completed within 2 km, last 2 years
63homes given permission on brownfield sites since 2021
+1.3%like-for-like prices in Stapleford South, 2024 → 2025 (council +4.0%)
+0%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
14 new homes completedflats · Mar 2026 – Oct 2026
Oct 2026
1.7 km away - New homes
24 new homes completedhouses · Apr 2025 – Aug 2026
Aug 2026
2.0 km away - New school
New school: Hemlock Stone SchoolOther independent special school, other independent special school
Mar 2026
1.2 km away - New homes
8 new homes completedhouses · Jan 2026
Jan 2026
1.8 km away - New homes
8 new homes completedhouses · Jan 2026
Jan 2026
1.5 km away - New homes
9 new homes completedhouses · Jul 2025
Jul 2025
1.1 km away - New homes
5 new homes completed2 flats, 3 houses · May 2025
May 2025
1.9 km away - New homes
8 new homes completed3 flats, 5 houses · May 2025
May 2025
1.1 km away - New homes
5 new homes completedhouses · May 2025
May 2025
1.1 km away - New homes
15 new homes completedflats · Apr 2025
Apr 2025
1.2 km away - Planning permission
Permission for 10 homesPublic House, East Of 9, Derby Road, Sandiacre, Derbyshire, NG10 5HW (full planning permission) Dec 2024
1.8 km away - New homes
6homes extended 2021–2025, typically adding 27 m²
12since energy certificates began (2008)
1in NG9 7JJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
331hours of spills in 2025 between them (typical neighbourhood: about 36)
78spill events counted
- Severn Trent Water
Sandiacre - Mark Street (So)into River Erewash27 spills, 162 hours in 2025
1.3 km away - Severn Trent Water
Stapleford-Bessell Lane Wwtwinto Tributary Of River Erewash19 spills, 126 hours in 2025
1.0 km away - Severn Trent Water
Crossley Ps - Storm/Emergency Ofinto River Erewash10 spills, 21 hours in 2025
1.5 km away - Severn Trent Water
Sandiacre Road Pumping Station Ssointo River Erewash2 spills, 17 hours in 2025
1.5 km away - Severn Trent Water
Bennett Street Csointo River Erewash1 spills, 2 hours in 2025
1.9 km away - Severn Trent Water
Starch Lane Csointo River Erewash9 spills, 1 hours in 2025
1.5 km away - Severn Trent Water
Woodstock Road Csointo River Erewash8 spills, 1 hours in 2025
1.9 km away - Severn Trent Water
Portland Road/Carrfield Avenue Ssointo River Erewash2 spills, 1 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
48 planned, approved or being built and 10 running (16 MW between them). Those within 5 km are on the map above.
- Rooftop solar
George Spencer Academy, Arthur Mee Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
350 m away - Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
1.0 km away - Battery storage
Tamworth Road, Long Eaton - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
3.3 km away - Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
3.7 km away - Rooftop solar
Crompton Road - Solar PanelsApproved, not yet built · 400 kW
May 2022
3.9 km away - Rooftop solar
Donaldson Timber, Hallam Fields Road - Solar PanelsApproved, not yet built · 240 kW
Mar 2025
4.0 km away - Rooftop solar
JJ Foodservice, Lilac Grove - Solar PanelsPlanning application in · 400 kW
May 2026
4.3 km away - Solar farm
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in · 16 MW
Feb 2025
4.4 km away - Battery storage
Moto Hospitality, Trowell Services Area North - Solar Farm & BatteryPlanning application in
Feb 2025
4.4 km away - Rooftop solar
Hadden Court, Glaisdale Parkway - Roof Mounted Solar PanelsApproved, not yet built · 330 kW
Nov 20244.8 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Minor
Stapleford Lane, StaplefordWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
650 m away - Minor
Stapleford Lane, TotonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
9.4 km away - RecommendationSept 2026
9.4 km away - RecommendationSept 2026
11.7 km away - Decideddecided Aug 2023
15.8 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
17.1 km away - Decideddecided Dec 2014
20.1 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 3.4 km); Beeston Weir Hydro Scheme (hydro, 3.9 km); Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 5.2 km); Willow Road - Roof mounted solar panels (rooftop solar, 6.2 km); Manners Avenue - Solar Panels (rooftop solar, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.