Within 2 km, around Toton in Broxtowe. Building, planning, schools, transport, prices and crime.
49new homes completed within 2 km, last 2 years
64homes given permission on brownfield sites since 2021
-1.8%like-for-like prices in Toton, 2024 → 2025 (council +4.0%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedflats · Oct 2026
planned Oct 2026
1.8 km away - New homes
9 new homes completedflats · Mar 2025
Mar 2025
1.8 km away - New homes
8 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025
1.4 km away - Planning permission
Permission for 9 homesformer Wilko offices, 56-58 Market Place, Long Eaton, Derbyshire, NG10 1LJ (full planning permission) Jun 2024
1.9 km away - Planning permissionMay 2024
1.9 km away - Planning permissionMay 2022
1.0 km away - Planning permission
Permission for 10 homesOakleys Garage, 24 Beech Avenue, Long Eaton, Derbyshire, NG10 2AX (full planning permission) May 2022
1.5 km away - Planning permissionOct 2021
1.9 km away - Planning permission
14homes extended 2021–2025, typically adding 24 m²
26since energy certificates began (2008)
1in NG9 6DD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
245hours of spills in 2025 between them (typical neighbourhood: about 36)
41spill events counted
- Severn Trent Water
Toton Wastewater Treatment Worksinto River Erewash24 spills, 242 hours in 2025
750 m away - Severn Trent Water
High Road/Heathfield Grove Csointo Trib Of River Trent7 spills, 1 hours in 2025
1.4 km away - Severn Trent Water
Woodstock Road Csointo River Erewash8 spills, 1 hours in 2025
1.0 km away - Severn Trent Water
Portland Road/Carrfield Avenue Ssointo River Erewash2 spills, 1 hours in 2025
950 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
53 planned, approved or being built and 11 running (21 MW between them). Those within 5 km are on the map above.
- Battery storage
Tamworth Road, Long Eaton - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
2.4 km away - Rooftop solar
George Spencer Academy, Arthur Mee Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
2.4 km away - Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
2.6 km away - Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
2.9 km away - Rooftop solar
JJ Foodservice, Lilac Grove - Solar PanelsPlanning application in · 400 kW
May 2026
3.6 km away - Energy from waste
EMERGE (East Midlands Energy Re-Generation)Approved, not yet built · 50 MW
Mar 2022
3.9 km away - Battery storage
Gotham - Battery Energy storagePlanning application in · 100 MW
May 2024
4.6 km away - Solar farm
Ratcliffe On Soar Power Station - Solar FarmApproved, not yet built · 9 MW
Jul 2023
4.8 km away - Rooftop solar
Boots Campus - Roof Top Solar FarmApproved, not yet built · 6 MW
Dec 2022
4.8 km away - Rooftop solar
Makro Booker Wholesale, The Midway - Solar PanelsApproved, not yet built · 310 kW
Sept 2025
5.3 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Haddon Crescent, ChilwellHighway repair and maintenance works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
700 m away - Major
Haddon Crescent, ChilwellHighway repair and maintenance works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
8.0 km away - RecommendationSept 2026
8.0 km away - RecommendationSept 2026
10.4 km away - Decideddecided Aug 2023
17.3 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
19.3 km away - Decideddecided Dec 2014
20.7 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Beeston Weir Hydro Scheme (hydro, 2.6 km); Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 3.1 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 5.6 km); Willow Road - Roof mounted solar panels (rooftop solar, 6.1 km); Eastcroft Municipal Depot (solar farm, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.