What's changing near NG9 5AT
Within 2 km, around Toton in Broxtowe. Building, planning, schools, transport, prices and crime.
34new homes completed within 2 km, last 2 years
9homes given permission on brownfield sites since 2021
-1.8%like-for-like prices in Toton, 2024 → 2025 (council +4.0%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
15homes extended 2021–2025, typically adding 22 m²
26since energy certificates began (2008)
0in NG9 5AT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
343hours of spills in 2025 between them (typical neighbourhood: about 36)
63spill events counted
- Severn Trent Water
Toton Wastewater Treatment Worksinto River Erewash24 spills, 242 hours in 2025
1.2 km away - Severn Trent Water
Barkers Lane/ Meadow Lane Spsinto River Trent22 spills, 98 hours in 2025
1.8 km away - Severn Trent Water
High Road/Heathfield Grove Csointo Trib Of River Trent7 spills, 1 hours in 2025
900 m away - Severn Trent Water
Woodstock Road Csointo River Erewash8 spills, 1 hours in 2025
1.6 km away - Severn Trent Water
Portland Road/Carrfield Avenue Ssointo River Erewash2 spills, 1 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
51 planned, approved or being built and 10 running (15 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
2.3 km away - Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
2.5 km away - Rooftop solar
George Spencer Academy, Arthur Mee Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
2.6 km away - Battery storage
Tamworth Road, Long Eaton - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025
3.0 km away - Rooftop solar
JJ Foodservice, Lilac Grove - Solar PanelsPlanning application in · 400 kW
May 2026
3.1 km away - Rooftop solar
Boots Campus - Roof Top Solar FarmApproved, not yet built · 6 MW
Dec 2022
4.2 km away - Energy from waste
EMERGE (East Midlands Energy Re-Generation)Approved, not yet built · 50 MW
Mar 2022
4.3 km away - Battery storage
Gotham - Battery Energy storagePlanning application in · 100 MW
May 2024
4.5 km away - Rooftop solar
Makro Booker Wholesale, The Midway - Solar PanelsApproved, not yet built · 310 kW
Sept 2025
4.7 km away - Hydrogen
Redfield Road - Hydrogen Energy ProjectApproved, not yet built
Feb 2022
5.0 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Haddon Crescent, ChilwellHighway repair and maintenance works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
250 m away - Major
Haddon Crescent, ChilwellHighway repair and maintenance works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
250 m away - Standard
Ferndale Close, AttenboroughUtility asset works · CADENT GAS LIMITED · Give and take
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
8.5 km away - RecommendationSept 2026
8.5 km away - RecommendationSept 2026
10.9 km away - Decideddecided Aug 2023
17.7 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
19.5 km away - Decideddecided Dec 2014
21.3 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Beeston Weir Hydro Scheme (hydro, 2.0 km); Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 2.8 km); Willow Road - Roof mounted solar panels (rooftop solar, 5.5 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 5.7 km); Eastcroft Municipal Depot (solar farm, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.