What's changing near NG9 2UY
Within 2 km, around Beeston Town in Broxtowe. Building, planning, schools, transport, prices and crime.
233new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.9%like-for-like prices in Beeston Town, 2024 → 2025 (council +4.0%)
+20%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
15 new homes completedflats · Mar 2026 – Oct 2026
Oct 2026
1.7 km away - New homes
21 new homes completedflats · Jan 2025 – Sep 2026
Sept 2026
1.4 km away - New homes
47 new homes completedhouses · Dec 2025 – Jul 2026
Jul 2026
2.0 km away - New homes
34 new homes completedhouses · Sep 2025 – Jul 2026
Jul 2026
1.9 km away - New homes
6 new homes completedhouses · May 2025 – May 2026
May 2026
1.2 km away - New homes
23 new homes completedhouses · Jul 2025 – Sep 2025
Sept 2025
1.9 km away - New homes
32 new homes completedhouses · Jun 2025 – Aug 2025
Aug 2025
1.8 km away - New homes
8 new homes completedhouses · Nov 2024 – Jan 2025
Jan 2025
1.9 km away - New homes
7 new homes completedflats · Dec 2024
Dec 2024
450 m away - New homes
8 new homes completedhouses · Nov 2024 – Dec 2024
Dec 2024
1.4 km away - New homes
9 new homes completedflats · Nov 2024
Nov 2024
1000 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 27 postcodes nearby had new homes completed in the last two years.
31homes extended 2021–2025, typically adding 36 m²
54since energy certificates began (2008)
1in NG9 2UY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
799hours of spills in 2025 between them (typical neighbourhood: about 36)
117spill events counted
- Severn Trent Water
Beeston (Lilac Grove) Stwinto Pasture Lane Dyke88 spills, 699 hours in 2025
1.5 km away - Severn Trent Water
Barkers Lane/ Meadow Lane Spsinto River Trent22 spills, 98 hours in 2025
2.0 km away - Severn Trent Water
High Road/Heathfield Grove Csointo Trib Of River Trent7 spills, 1 hours in 2025
2.0 km away - Severn Trent Water
Derby Road Bramcote Csointo Tottle Brook0 spills, 0 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
53 planned, approved or being built and 10 running (16 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
1.3 km away - Rooftop solar
JJ Foodservice, Lilac Grove - Solar PanelsPlanning application in · 400 kW
May 2026
1.3 km away - Rooftop solar
Boots Campus - Roof Top Solar FarmApproved, not yet built · 6 MW
Dec 2022
2.2 km away - Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
2.4 km away - Rooftop solar
Makro Booker Wholesale, The Midway - Solar PanelsApproved, not yet built · 310 kW
Sept 2025
2.4 km away - Hydrogen
Redfield Road - Hydrogen Energy ProjectApproved, not yet built
Feb 2022
2.6 km away - Rooftop solar
Redfield Road - Solar PanelsApproved, not yet built · 450 kW
Jan 2025
2.7 km away - Rooftop solar
JK Foods UK, Bull Close Road - Solar PanelsApproved, not yet built · 310 kW
Dec 2024
2.9 km away - Rooftop solar
Sytner Group, Abbeyfield Road - Solar PanelsApproved, not yet built · 160 kW
Feb 2026
3.0 km away - Rooftop solar
Lenton Lane - Solar PanelsPlanning application in · 160 kW
Aug 2024
3.1 km away - Rooftop solar
Road and street works within 1 km
19 permitted works running now or planned, 11 of them major.
- Major, planned
Marlborough Road, BeestonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Nov 2026
350 m away - Major
Marlborough Road, BeestonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Nov 2026
350 m away - Major, planned
Abbey Road, BeestonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Nov 2026
350 m away - Major
Abbey Road, BeestonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Nov 2026
350 m away - Major, planned
Moore Gate, BeestonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Sept 2027
600 m away - Major
Moore Gate, BeestonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Sept 2027
600 m away - Major
Lower Regent Street, BeestonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Give and take
Jul 2026 to Oct 2026
750 m away - Major, planned
King Street, BeestonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Feb 2027
850 m away - Major, planned
Windsor Street, BeestonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Feb 2027
850 m away
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
11.4 km away - RecommendationSept 2026
11.4 km away - RecommendationSept 2026
13.7 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
18.8 km away - Decideddecided Aug 2023
18.9 km away - Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Beeston Weir Hydro Scheme (hydro, 2.0 km); Willow Road - Roof mounted solar panels (rooftop solar, 3.0 km); Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 4.3 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 5.2 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.