What's changing near NG9 1NE
Within 2 km, around Beeston Rylands in Broxtowe. Building, planning, schools, transport, prices and crime.
378new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.6%like-for-like prices in Beeston Rylands, 2024 → 2025 (council +4.0%)
+3%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
33 new homes completedhouses · Apr 2026 – Oct 2026
planned Oct 2026
850 m away - New homes
15 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
900 m away - New homes
21 new homes completedflats · Jan 2025 – Sep 2026
Sept 2026
500 m away - New homes
30 new homes completedhouses · Jun 2025 – Aug 2026
Aug 2026
1.2 km away - New homes
47 new homes completedhouses · Dec 2025 – Jul 2026
Jul 2026
700 m away - New homes
34 new homes completedhouses · Sep 2025 – Jul 2026
Jul 2026
650 m away - New homes
33 new homes completedhouses · Sep 2025 – Jul 2026
Jul 2026
1.3 km away - New homes
32 new homes completedhouses · Jun 2025 – Jul 2026
Jul 2026
900 m away - New homes
20 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.2 km away - New homes
19 new homes completedhouses · Sep 2025 – May 2026
May 2026
950 m away - New homes
23 new homes completedhouses · Jul 2025 – Sep 2025
Sept 2025
700 m away - New homes
32 new homes completedhouses · Jun 2025 – Aug 2025
Aug 2025
700 m away
8homes extended 2021–2025, typically adding 30 m²
11since energy certificates began (2008)
1in NG9 1NE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
927hours of spills in 2025 between them (typical neighbourhood: about 36)
243spill events counted
- Severn Trent Water
Beeston (Lilac Grove) Stwinto Pasture Lane Dyke88 spills, 699 hours in 2025
1000 m away - Severn Trent Water
Barkers Lane/ Meadow Lane Spsinto River Trent22 spills, 98 hours in 2025
900 m away - Severn Trent Water
Broadgate Storm Sewage Overflowinto River Trent52 spills, 82 hours in 2025
750 m away - Severn Trent Water
Wollaton Road/High Road Jcn Csointo River Trent34 spills, 18 hours in 2025
750 m away - Severn Trent Water
High Road Sewage Pumping Stationinto River Erewash21 spills, 11 hours in 2025
750 m away - Severn Trent Water
Wollaton Road Csointo River Trent23 spills, 9 hours in 2025
750 m away - Severn Trent Water
Station Road Csointo River Trent3 spills, 9 hours in 2025
750 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
56 planned, approved or being built and 9 running (17 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
700 m away - Rooftop solar
JJ Foodservice, Lilac Grove - Solar PanelsPlanning application in · 400 kW
May 2026
800 m away - Rooftop solar
Boots Campus - Roof Top Solar FarmApproved, not yet built · 6 MW
Dec 2022
1.7 km away - Rooftop solar
Makro Booker Wholesale, The Midway - Solar PanelsApproved, not yet built · 310 kW
Sept 2025
2.1 km away - Rooftop solar
JK Foods UK, Bull Close Road - Solar PanelsApproved, not yet built · 310 kW
Dec 2024
2.4 km away - Rooftop solar
Redfield Road - Solar PanelsApproved, not yet built · 450 kW
Jan 2025
2.4 km away - Hydrogen
Redfield Road - Hydrogen Energy ProjectApproved, not yet built
Feb 2022
2.5 km away - Rooftop solar
Sytner Group, Abbeyfield Road - Solar PanelsApproved, not yet built · 160 kW
Feb 2026
2.5 km away - Rooftop solar
Lenton Lane - Solar PanelsPlanning application in · 160 kW
Aug 2024
2.9 km away - Rooftop solar
Lenton Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2026
2.9 km away - Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
10.8 km away - RecommendationSept 2026
10.8 km away - RecommendationSept 2026
13.1 km away - Decideddecided Aug 2023
20.1 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
20.7 km away - Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Beeston Weir Hydro Scheme (hydro, 700 m); Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 2.8 km); Willow Road - Roof mounted solar panels (rooftop solar, 3.1 km); Eastcroft Municipal Depot (solar farm, 5.5 km); Eastcroft Municipal Depot (battery storage, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.