What's changing near NG8 2RW
Within 2 km, around Beeston North in Broxtowe. Building, planning, schools, transport, prices and crime.
89new homes completed within 2 km, last 2 years
13homes given permission on brownfield sites since 2021
+7.0%like-for-like prices in Beeston North, 2024 → 2025 (council +4.0%)
+22%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
14 new homes completedflats · Mar 2026 – Oct 2026
Oct 2026
1.8 km away - New homes
6 new homes completedhouses · May 2025 – May 2026
May 2026
300 m away - New homes
34 new homes completedhouses · Oct 2024 – Oct 2025
Oct 2025
2.0 km away - New homes
7 new homes completedflats · Dec 2024
Dec 2024
1.7 km away - Planning permissionOct 2023
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 38 m²
42since energy certificates began (2008)
2in NG8 2RW itself
- Extendedcertificate 2024
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
53 planned, approved or being built and 10 running (16 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Hadden Court, Glaisdale Parkway - Roof Mounted Solar PanelsApproved, not yet built · 330 kW
Nov 2024
1.9 km away - Rooftop solar
Glaisdale Point, Units 10 To 12 - Roof Mounted Solar PV ArrayApproved, not yet built · 270 kW
Feb 2025
1.9 km away - Battery storage
Southfields Farm, Common Lane - Battery StorageApproved, not yet built · 130 MW
Aug 2024
2.5 km away - Rooftop solar
JJ Foodservice, Lilac Grove - Solar PanelsPlanning application in · 400 kW
May 2026
2.7 km away - Rooftop solar
Harvey Hadden Sports Village, Wigman Road - Solar PanelsApproved, not yet built · 300 kW
Feb 2025
2.8 km away - Rooftop solar
Heart Internet, Beeston Business Park - Solar PanelsApproved, not yet built · 570 kW
Jan 2025
2.8 km away - Rooftop solar
Bluecoat Beechdale Academy, Harvey Road - Solar PanelsApproved, not yet built · 320 kW
Nov 2025
2.9 km away - Rooftop solar
Ambulance Station, Beechdale Road - Solar PanelsApproved, not yet built · 150 kW
Apr 2026
3.0 km away - Rooftop solar
Madison Court, Derwent Way - Solar PanelsApproved, not yet built · 180 kW
May 2023
3.1 km away - Hydrogen
Redfield Road - Hydrogen Energy ProjectApproved, not yet built
Feb 20223.1 km away
Road and street works within 1 km
7 permitted works running now or planned.
- Standard
Woodside Road, NottinghamWorks for road purposes · NATIONAL HIGHWAYS · Lane closure
Nov 2026 to Nov 2026
700 m away - Standard
Woodside Road, NottinghamWorks for road purposes · NATIONAL HIGHWAYS · Lane closure
Nov 2026 to Nov 2026
700 m away - Minor
Wollaton Vale, NottinghamUtility asset works · NOTTINGHAM CITY COUNCIL · Lane closure
Oct 2026 to Oct 2026
500 m away - Immediate - emergency
Bourne Close, BeestonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026
500 m away - Minor
Woodside Road, NottinghamUtility asset works · NOTTINGHAM CITY COUNCIL · Lane closure
Oct 2026 to Oct 2026
750 m away - Minor
Woodside Road, NottinghamUtility asset works · NOTTINGHAM CITY COUNCIL · Lane closure
Oct 2026 to Oct 2026
950 m away - Minor
Rivergreen Crescent, BramcoteUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
12.4 km away - RecommendationSept 2026
12.4 km away - RecommendationSept 2026
14.8 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
17.6 km away - Decideddecided Aug 2023
18.4 km away - Decideddecided Dec 2014
23.4 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Willow Road - Roof mounted solar panels (rooftop solar, 3.2 km); Beeston Weir Hydro Scheme (hydro, 3.5 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 4.3 km); Fairham Business Park, Foresters Avenue - Roof Mounted Solar Panels (rooftop solar, 5.8 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.