What's changing near NG7 7JU
Within 2 km, around New Basford in Nottingham. Building, planning, schools, transport, prices and crime.
220new homes completed within 2 km, last 2 years
652homes given permission on brownfield sites since 2021
+4.7%like-for-like prices in New Basford, 2024 → 2025 (council +0.6%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Aug 2026
Aug 2026
1.9 km away - New homes
9 new homes completedhouses · Mar 2026 – Jun 2026
Jun 2026
150 m away - New homes
57 new homes completedhouses · Feb 2025 – Jun 2026
Jun 2026
800 m away - New homes
19 new homes completedhouses · Sep 2025 – Jun 2026
Jun 2026
850 m away - New homes
12 new homes completedhouses · Feb 2026 – Apr 2026
Apr 2026
650 m away - New homes
6 new homes completedflats · Nov 2025
Nov 2025
750 m away - New homes
8 new homes completedhouses · Sep 2025 – Nov 2025
Nov 2025
850 m away - New homes
11 new homes completedflats · Oct 2025
Oct 2025
800 m away - New homes
12 new homes completedflats · Sep 2025
Sept 2025
1.9 km away - New homes
5 new homes completedflats · Jul 2025
Jul 2025
1.2 km away - New homes
12 new homes completedhouses · Mar 2025
Mar 2025
1.7 km away - New homes
30 new homes completedflats · Dec 2024
Dec 2024
1.7 km away - New school
33homes extended 2021–2025, typically adding 25 m²
93since energy certificates began (2008)
1in NG7 7JU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
176hours of spills in 2025 between them (typical neighbourhood: about 36)
149spill events counted
- Severn Trent Water
Newquay Av/Churchfield Lane Jct Csointo River Leen58 spills, 122 hours in 2025
1.5 km away - Severn Trent Water
Sherwood - Valley Rd/Harmston Rise (Cso)into Day Brook21 spills, 18 hours in 2025
1.4 km away - Severn Trent Water
Bulwell - Vernon Road 129 Csointo River Leen10 spills, 14 hours in 2025
1.8 km away - Severn Trent Water
Harwill Crescent Csointo River Leen26 spills, 9 hours in 2025
1.0 km away - Severn Trent Water
Nottingham - Retford Road (Cso)into Day Brook7 spills, 5 hours in 2025
1.5 km away - Severn Trent Water
Nuthall Road Csointo River Leen13 spills, 3 hours in 2025
1.0 km away - Severn Trent Water
Sherwood - Valley Rd Csointo Day Brook6 spills, 2 hours in 2025
1.4 km away - Severn Trent Water
Aspley - Melbourne Rd/Ledbury Vale (Cso)into River Leen 6 spills, 1 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
50 planned, approved or being built and 18 running (45 MW between them). Those within 5 km are on the map above.
- Rooftop solar
David Lloyd Tennis And Fitness Club, Aspley Lane - Solar PanelsApproved, not yet built
Sept 2025
1.5 km away - Rooftop solar
Nottingham Trent University, Maudslay - Solar PanelsApproved, not yet built · 190 kW
Dec 2024
2.1 km away - Rooftop solar
Ambulance Station, Beechdale Road - Solar PanelsApproved, not yet built · 150 kW
Apr 2026
2.3 km away - Rooftop solar
Madison Court, Derwent Way - Solar PanelsApproved, not yet built · 180 kW
May 2023
2.4 km away - Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026
3.0 km away - Rooftop solar
Bluecoat Beechdale Academy, Harvey Road - Solar PanelsApproved, not yet built · 320 kW
Nov 2025
3.2 km away - Rooftop solar
Games Workshop Euro Hub, Willow Road - Solar PanelsApproved, not yet built · 260 kW
Feb 2023
3.6 km away - Rooftop solar
Harvey Hadden Sports Village, Wigman Road - Solar PanelsApproved, not yet built · 300 kW
Feb 2025
3.6 km away - Energy from waste
Eastcroft EfW (3rd Line)Approved, not yet built · 3 MW
Jan 2016
3.6 km away - Rooftop solar
Lenton Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2026
4.1 km away
Road and street works within 1 km
5 permitted works running now or planned, 4 of them major.
- Major
Leslie Road, NottinghamHighway improvement works · NOTTINGHAM CITY COUNCIL · Road closure
Jul 2026 to Nov 2027
700 m away - Major
Premier Road, NottinghamHighway improvement works · NOTTINGHAM CITY COUNCIL · Road closure
Jul 2026 to Nov 2027
700 m away - Major
Foxhall Road, NottinghamHighway improvement works · NOTTINGHAM CITY COUNCIL · Road closure
Jul 2026 to Nov 2027
700 m away - Major
Russell Road, NottinghamHighway improvement works · NOTTINGHAM CITY COUNCIL · Road closure
Jul 2026 to Nov 2027
700 m away - Minor
Nottingham Road, NottinghamDisconnection or alteration of supply · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026
300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
17.3 km away - RecommendationSept 2026
17.3 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
19.6 km away - RecommendationSept 2026
19.7 km away - Decideddecided Aug 2023
22.8 km away - Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Eastcroft EfW (Lines 1 & 2) (energy from waste, 3.6 km); Eastcroft Municipal Depot (solar farm, 3.6 km); Eastcroft Municipal Depot (battery storage, 3.6 km); Willow Road - Roof mounted solar panels (rooftop solar, 3.7 km); Trent Basin Community Battery (battery storage, 4.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.