Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
663hours of spills in 2025 between them (typical neighbourhood: about 36)
202spill events counted
Severn Trent Water
Nottingham Road Hucknall Csointo Tributary Of River Leen64 spills, 201 hours in 2025
1.9 km away
Severn Trent Water
Bulwell - Hucknall Ln/Lawton Dr Csointo River Leen35 spills, 199 hours in 2025
1.2 km away
Severn Trent Water
Nottingham - Hucknall Lane/Grindon Cresc (Cso)into River Leen30 spills, 136 hours in 2025
1.0 km away
Severn Trent Water
Nottingham - Hucknall Lane/Aston Drive (Cso)into River Leen34 spills, 98 hours in 2025
1.0 km away
Severn Trent Water
Bulwell - St Andrews Close Csointo River Leen23 spills, 22 hours in 2025
500 m away
Severn Trent Water
Old Mill Close Csointo River Leen14 spills, 7 hours in 2025
1.9 km away
Severn Trent Water
Bulwell - Main Street/Carey Rd Csointo River Leen2 spills, 1 hours in 2025
450 m away
Severn Trent Water
Bulwell - Main Street/Linby Street (Cso)into River Leen0 spills, 0 hours in 2025
44 planned, approved or being built and 12 running (26 MW between them). Those within 5 km are on the map above.
Rooftop solar
Bulwell Academy, Squires Avenue - Solar PanelsApproved, not yet built · 150 kW
Mar 2026 600 m away
Rooftop solar
Aspect Business Park - Solar PanelsApproved, not yet built · 270 kW
Mar 2024 750 m away
Energy from waste
Bulwell EnergyBeing built · 30 MW
May 2017 1.2 km away
Rooftop solar
Blenheim Park Road - Solar PanelsApproved, not yet built · 170 kW
Jan 2025 1.7 km away
Battery storage
Watnall Road, Hucknall - Micro Energy StoragePlanning application in · 200 kW
Apr 2026 2.0 km away
Rooftop solar
ITP Aero, Harrier Park - Solar PanelsApproved, not yet built · 2 MW
Dec 2024 2.2 km away
Solar farm
Long Lane Solar Farm / Nottingham Brick WorksBeing built · 17 MW
Jul 2016 2.6 km away
Rooftop solar
Sainsburys Supermarket, Greens Lane - Solar PanelsPlanning application in · 310 kW
May 2026 3.7 km away
Rooftop solar
Bluecoat Beechdale Academy, Harvey Road - Solar PanelsApproved, not yet built · 320 kW
Nov 2025 4.1 km away
Rooftop solar
David Lloyd Tennis And Fitness Club, Aspley Lane - Solar PanelsApproved, not yet built
Sept 2025 4.1 km away
Rooftop solar
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
Major, planned
Murby Crescent, NottinghamUtility asset works · CADENT GAS LIMITED · Road closure
Dec 2026 to Dec 2026 250 m away
Major, planned
Sellers Wood Drive, NottinghamHighway improvement works · NOTTINGHAM CITY COUNCIL · Two-way signals
Mar 2027 to Jun 2027 450 m away
Major
Sellers Wood Drive, NottinghamUtility asset works · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 28.4 km away
Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.