Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
14storm overflows within 2 km
62hours of spills in 2025 between them (typical neighbourhood: about 36)
105spill events counted
Severn Trent Water
Sherwood - Valley Rd/Harmston Rise (Cso)into Day Brook21 spills, 18 hours in 2025
550 m away
Severn Trent Water
Bulwell - Vernon Road 129 Csointo River Leen10 spills, 14 hours in 2025
150 m away
Severn Trent Water
Harwill Crescent Csointo River Leen26 spills, 9 hours in 2025
1.8 km away
Severn Trent Water
Sherwood - Valley Rd-Edwards Ln Csointo Day Brook12 spills, 7 hours in 2025
2.0 km away
Severn Trent Water
Nottingham - Retford Road (Cso)into Day Brook7 spills, 5 hours in 2025
1.1 km away
Severn Trent Water
Nuthall Road Csointo River Leen13 spills, 3 hours in 2025
1.8 km away
Severn Trent Water
Sherwood - Valley Rd Csointo Day Brook6 spills, 2 hours in 2025
550 m away
Severn Trent Water
Aspley - Melbourne Rd/Ledbury Vale (Cso)into River Leen 6 spills, 1 hours in 2025
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 18.2 km away
Recommendation
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
New-home postcodes with fewer than 5 homes are counted above but not listed. 28 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Arnold Hill Spencer Academy - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 4.3 km away
Rooftop solar
Hadden Court, Glaisdale Parkway - Roof Mounted Solar PanelsApproved, not yet built · 330 kW
Nov 2024 4.4 km away
Running nearest: Willow Road - Roof mounted solar panels (rooftop solar, 5.1 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 5.4 km); Eastcroft Municipal Depot (solar farm, 5.4 km); Eastcroft Municipal Depot (battery storage, 5.4 km); Dorket Head (landfill gas, 5.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 26.1 km away
Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 28.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.