Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
406hours of spills in 2025 between them (typical neighbourhood: about 36)
113spill events counted
Severn Trent Water
Nottingham Road Hucknall Csointo Tributary Of River Leen64 spills, 201 hours in 2025
1.9 km away
Severn Trent Water
Bulwell - Hucknall Ln/Lawton Dr Csointo River Leen35 spills, 199 hours in 2025
1.9 km away
Severn Trent Water
Old Mill Close Csointo River Leen14 spills, 7 hours in 2025
39 planned, approved or being built and 13 running (30 MW between them). Those within 5 km are on the map above.
Rooftop solar
Bulwell Academy, Squires Avenue - Solar PanelsApproved, not yet built · 150 kW
Mar 2026 2.4 km away
Rooftop solar
Arnold Hill Spencer Academy - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 3.2 km away
Rooftop solar
Aspect Business Park - Solar PanelsApproved, not yet built · 270 kW
Mar 2024 3.5 km away
Energy from waste
Bulwell EnergyBeing built · 30 MW
May 2017 3.6 km away
Rooftop solar
ITP Aero, Harrier Park - Solar PanelsApproved, not yet built · 2 MW
Dec 2024 4.0 km away
Rooftop solar
Hucknall Leisure Centre, Linby Road - Solar PanelsApproved, not yet built
Feb 2025 4.2 km away
Battery storage
Watnall Road, Hucknall - Micro Energy StoragePlanning application in · 200 kW
Apr 2026 4.2 km away
Rooftop solar
Blenheim Park Road - Solar PanelsApproved, not yet built · 170 kW
Jan 2025 4.2 km away
Solar farm
Long Lane Solar Farm / Nottingham Brick WorksBeing built · 17 MW
Jul 2016 4.9 km away
Rooftop solar
David Lloyd Tennis And Fitness Club, Aspley Lane - Solar PanelsApproved, not yet built
Sept 2025 5.3 km away
Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
School closed: Tlg NottinghamOther independent school, other independent school (closure)
Dec 2022 1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
Ambulance Station, Beechdale Road - Solar PanelsApproved, not yet built · 150 kW
Apr 2026 6.1 km away
Rooftop solar
Bluecoat Beechdale Academy, Harvey Road - Solar PanelsApproved, not yet built · 320 kW
Nov 2025 6.1 km away
Running nearest: Dorket Head (landfill gas, 3.3 km); Burntstump Landfill Scheme (landfill gas, 4.1 km); Gedling Solar Farm (solar farm, 5.7 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 7.5 km); Eastcroft Municipal Depot (solar farm, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
decided Oct 2025 25.1 km away
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 27.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.