Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
decided Oct 2025 22.0 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.