367new homes completed within 2 km, last 2 years
131homes given permission on brownfield sites since 2021
+1.8%like-for-like prices in Plains Estate, 2024 → 2025 (council +1.9%)
+24%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
18 new homes completedflats · Sep 2026
Oct 2026
1.8 km away - New homes
13 new homes completedhouses · Sep 2025 – Sep 2026
Sept 2026
1.8 km away - New homes
17 new homes completedhouses · Jan 2026 – Sep 2026
Sept 2026
550 m away - New homes
16 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.1 km away - New homes
37 new homes completed16 flats, 21 houses · Oct 2025 – Sep 2026
Sept 2026
1.6 km away - New homes
37 new homes completedhouses · Nov 2024 – Jul 2026
Jul 2026
800 m away - New homes
47 new homes completedhouses · Jan 2025 – Jul 2026
Jul 2026
1.7 km away - New homes
14 new homes completedhouses · Nov 2025 – Jul 2026
Jul 2026
750 m away - New homes
27 new homes completedhouses · Jul 2025 – Jul 2026
Jul 2026
700 m away - New homes
33 new homes completedhouses · Oct 2024 – May 2026
May 2026
1.8 km away - New homes
9 new homes completedhouses · Mar 2025 – May 2026
May 2026
1.8 km away - New homes
12 new homes completedhouses · May 2025 – Apr 2026
Apr 2026
650 m away
14homes extended 2021–2025, typically adding 32 m²
25since energy certificates began (2008)
0in NG5 7HJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
38 planned, approved or being built and 13 running (36 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Arnold Hill Spencer Academy - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
1.0 km away - Battery storage
Burton Wood Farm, Spring Lane - Battery Energy StorageApproved, not yet built · 320 MW
Mar 2025
2.4 km away - Rooftop solar
Colwick Loop Road, Colwick - Solar PanelsApproved, not yet built · 750 kW
Sept 2023
5.3 km away - Rooftop solar
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025
5.5 km away - Rooftop solar
Nottingham Trent University, Maudslay - Solar PanelsApproved, not yet built · 190 kW
Dec 2024
6.1 km away - Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025
6.1 km away - Rooftop solar
ENVA England, Road Number 4 - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
6.1 km away - Rooftop solar
Bulwell Academy, Squires Avenue - Solar PanelsApproved, not yet built · 150 kW
Mar 2026
6.1 km away - Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026
6.4 km away - Energy from waste
Eastcroft EfW (3rd Line)Approved, not yet built · 3 MW
Jan 2016
6.6 km away
Road and street works within 1 km
6 permitted works running now or planned, 2 of them major.
- Major, planned
Laneham Avenue, ArnoldDisconnection or alteration of supply · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026
700 m away - Major
Laneham Avenue, ArnoldDisconnection or alteration of supply · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026
700 m away - Minor
Mapperley Plains, LambleyWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Apr 2027 to Apr 2027
200 m away - Immediate - emergency
Mapperley Plains, ArnoldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · No carriageway incursion
Aug 2026 to Oct 2026
400 m away - Minor
Mapperley Plains, MapperleyWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Apr 2027 to Apr 2027
400 m away - Minor
Mapperley Plains, MapperleyWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Apr 2027 to Apr 2027
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decisionapplication due July 2025
21.1 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
22.1 km away - Decideddecided Jan 2016
22.2 km away - RecommendationSept 2026
22.2 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
22.7 km away - RecommendationSept 2026
24.6 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Gedling Solar Farm (solar farm, 1.9 km); Dorket Head (landfill gas, 2.3 km); Burntstump Landfill Scheme (landfill gas, 5.0 km); Severn Trent Water - Stoke Bardolph Wind Turbine (wind farm, 5.0 km); Stoke Bardolph energy crop (Farm AD) (anaerobic digestion, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.