Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
2spill events counted
Severn Trent Water
Nottingham Road Csointo Day Brook1 spills, 0 hours in 2025
750 m away
Severn Trent Water
Woodthorpe Conningsby Garden E Csointo Day Brook1 spills, 0 hours in 2025
1.1 km away
Severn Trent Water
Nottingham – Mansfield Rd / Egerton Rd (Cso)into Day Brook 0 spills, 0 hours in 2025
1.1 km away
Severn Trent Water
Nottingham - Mansfield Road (Cso)into Day Brook 0 spills, 0 hours in 2025
1.1 km away
Severn Trent Water
Woodthorpe - Fairview Road (Cso)into Day Brook 0 spills, 0 hours in 2025
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
New-home postcodes with fewer than 5 homes are counted above but not listed. 24 postcodes nearby had new homes completed in the last two years.
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025 6.1 km away
Rooftop solar
Ambulance Station, Beechdale Road - Solar PanelsApproved, not yet built · 150 kW
Apr 2026 6.2 km away
Running nearest: Dorket Head (landfill gas, 2.6 km); Gedling Solar Farm (solar farm, 3.1 km); Burntstump Landfill Scheme (landfill gas, 5.0 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 6.0 km); Eastcroft Municipal Depot (solar farm, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Oct 2026 to Oct 2026 700 m away
Minor
Mansfield Road, DaybrookCore Sampling · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.