Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 21.5 km away
Recommendation
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
New-home postcodes with fewer than 5 homes are counted above but not listed. 31 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Ambulance Station, Beechdale Road - Solar PanelsApproved, not yet built · 150 kW
Apr 2026 5.4 km away
Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025 5.9 km away
Running nearest: Gedling Solar Farm (solar farm, 3.0 km); Dorket Head (landfill gas, 3.7 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 4.8 km); Eastcroft Municipal Depot (solar farm, 4.9 km); Eastcroft Municipal Depot (battery storage, 4.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Utility asset works · National Grid Electricity Distribution (East Midlands) · Some carriageway incursion
Nov 2026 to Nov 2026 600 m away
Standard
Central Avenue, MapperleyUtility asset works · National Grid Electricity Distribution (East Midlands) · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away
Immediate - emergency
Tunstall Road, WoodthorpeWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Give and take
Sept 2026 to Oct 2026 250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.