Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
47hours of spills in 2025 between them (typical neighbourhood: about 36)
59spill events counted
Severn Trent Water
Sherwood - Valley Rd/Harmston Rise (Cso)into Day Brook21 spills, 18 hours in 2025
700 m away
Severn Trent Water
Bulwell - Vernon Road 129 Csointo River Leen10 spills, 14 hours in 2025
1.2 km away
Severn Trent Water
Sherwood - Valley Rd-Edwards Ln Csointo Day Brook12 spills, 7 hours in 2025
950 m away
Severn Trent Water
Nottingham - Retford Road (Cso)into Day Brook7 spills, 5 hours in 2025
250 m away
Severn Trent Water
Sherwood - Valley Rd Csointo Day Brook6 spills, 2 hours in 2025
700 m away
Severn Trent Water
Nottingham Valley Rd/Tennis Cts Csointo Day Brook2 spills, 1 hours in 2025
350 m away
Severn Trent Water
Woodthorpe Conningsby Garden E Csointo Day Brook1 spills, 0 hours in 2025
1.8 km away
Severn Trent Water
Woodthorpe - Fairview Road (Cso)into Day Brook 0 spills, 0 hours in 2025
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 19.1 km away
Recommendation
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
New-home postcodes with fewer than 5 homes are counted above but not listed. 31 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026 4.6 km away
Rooftop solar
Blenheim Park Road - Solar PanelsApproved, not yet built · 170 kW
Jan 2025 4.7 km away
Running nearest: Dorket Head (landfill gas, 5.0 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 5.1 km); Eastcroft Municipal Depot (solar farm, 5.1 km); Eastcroft Municipal Depot (battery storage, 5.1 km); Willow Road - Roof mounted solar panels (rooftop solar, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Electric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 25.7 km away
Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.