Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
410hours of spills in 2025 between them (typical neighbourhood: about 36)
264spill events counted
Severn Trent Water
Stoke Bardolph Stwinto River Trent14 spills, 107 hours in 2025
34 planned, approved or being built and 14 running (41 MW between them). Those within 5 km are on the map above.
Rooftop solar
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025 1.3 km away
Rooftop solar
Colwick Loop Road, Colwick - Solar PanelsApproved, not yet built · 750 kW
Sept 2023 1.3 km away
Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025 1.8 km away
Rooftop solar
ENVA England, Road Number 4 - Solar PanelsApproved, not yet built · 1 MW
Jul 2025 1.8 km away
Battery storage
Burton Wood Farm, Spring Lane - Battery Energy StorageApproved, not yet built · 320 MW
Mar 2025 2.6 km away
Solar farm
Radcliffe Road, Holme Pierrepont - Solar FarmApproved, not yet built · 4 MW
Dec 2022 3.6 km away
Rooftop solar
Arnold Hill Spencer Academy - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 4.7 km away
Energy from waste
Eastcroft EfW (3rd Line)Approved, not yet built · 3 MW
Jan 2016 5.3 km away
Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026 5.6 km away
Solar farm
Heron Solar Farm & Battery StorageApproved, not yet built · 20 MW
Aug 2024 5.9 km away
Battery storage
Road and street works within 1 km
6 permitted works running now or planned, 5 of them major.
Major, planned
Conway Crescent, CarltonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 550 m away
Major
Conway Crescent, CarltonWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 550 m away
Major
Victoria Road, NetherfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 900 m away
Major, planned
Stoke Lane, GedlingWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away
Major
Stoke Lane, GedlingWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away
Standard
Victoria Park Way, NetherfieldUtility asset works · National Grid Electricity Distribution (East Midlands) · Lane closure
Nov 2026 to Nov 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
Heron Solar Farm & Battery StorageApproved, not yet built · 20 MW
Aug 2024 5.9 km away
Rooftop solar
Nottingham Trent University, Maudslay - Solar PanelsApproved, not yet built · 190 kW
Dec 2024 6.0 km away
Running nearest: Severn Trent Water - Stoke Bardolph Wind Turbine (wind farm, 1.7 km); Stoke Bardolph energy crop (Farm AD) (anaerobic digestion, 1.9 km); Colwick Industrial Estate (Farm and Food waste) (anaerobic digestion, 2.0 km); Gedling Solar Farm (solar farm, 2.5 km); Radcliffe Solar Farm (solar farm, 3.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 23.5 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.