What's changing near NG4 2BP
Within 2 km, around Netherfield & Colwick in Gedling. Building, planning, schools, transport, prices and crime.
172new homes completed within 2 km, last 2 years
43homes given permission on brownfield sites since 2021
+3.2%like-for-like prices in Netherfield & Colwick, 2024 → 2025 (council +1.9%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
20 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
1.4 km away - New homes
22 new homes completedhouses · Nov 2025 – Oct 2026
planned Oct 2026
1.5 km away - New homes
18 new homes completedhouses · May 2026 – Oct 2026
planned Oct 2026
1.3 km away - New homes
26 new homes completedhouses · Jun 2025 – Sep 2026
Sept 2026
1.5 km away - New homes
19 new homes completedhouses · Nov 2024 – Aug 2026
Aug 2026
1.4 km away - New homes
14 new homes completedhouses · Dec 2024 – Feb 2026
Feb 2026
1.5 km away - New homes
19 new homes completedhouses · Nov 2024 – Oct 2025
Oct 2025
2.0 km away - New homes
11 new homes completedhouses · Nov 2024 – Mar 2025
Mar 2025
1.9 km away - New homes
5 new homes completedhouses · Nov 2024
Dec 2024
1.9 km away - Planning permissionJun 2022
1000 m away - Planning permission
21homes extended 2021–2025, typically adding 30 m²
33since energy certificates began (2008)
2in NG4 2BP itself
- Extendedcertificate 2023
- Extendedcertificate 2018
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
303hours of spills in 2025 between them (typical neighbourhood: about 36)
250spill events counted
- Severn Trent Water
Carlton - Cavendish Road (Cso)into Ouse Dyke 44 spills, 64 hours in 2025
1.3 km away - Severn Trent Water
Main Road Csointo Ouse Dyke54 spills, 53 hours in 2025
1.5 km away - Severn Trent Water
Worth Street/Foxhill Road Csointo Ouse Dyke33 spills, 50 hours in 2025
1.3 km away - Severn Trent Water
Various Cso'S - Areas Of Carltoninto Tributary Of Ouse Dyke44 spills, 43 hours in 2025
1.3 km away - Severn Trent Water
Various Cso'S - Areas Of Carltoninto Ouse Dyke15 spills, 41 hours in 2025
1.3 km away - Severn Trent Water
Kirk Road Csointo Tributary Of Ouse Dyke35 spills, 39 hours in 2025
1.3 km away - Severn Trent Water
Various Cso'S - Areas Of Carltoninto Ouse Dyke20 spills, 11 hours in 2025
1.3 km away - Severn Trent Water
Various Cso'S - Areas Of Carltoninto Ouse Dyke4 spills, 1 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
43 planned, approved or being built and 15 running (42 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Colwick Loop Road, Colwick - Solar PanelsApproved, not yet built · 750 kW
Sept 2023
750 m away - Rooftop solar
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025
1.3 km away - Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025
1.7 km away - Rooftop solar
ENVA England, Road Number 4 - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
1.7 km away - Solar farm
Radcliffe Road, Holme Pierrepont - Solar FarmApproved, not yet built · 4 MW
Dec 2022
2.9 km away - Battery storage
Burton Wood Farm, Spring Lane - Battery Energy StorageApproved, not yet built · 320 MW
Mar 2025
3.7 km away - Energy from waste
Eastcroft EfW (3rd Line)Approved, not yet built · 3 MW
Jan 2016
3.8 km away - Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026
4.2 km away - Rooftop solar
Nottingham Trent University, Maudslay - Solar PanelsApproved, not yet built · 190 kW
Dec 2024
4.6 km away - Rooftop solar
Arnold Hill Spencer Academy - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
4.7 km away
Road and street works within 1 km
7 permitted works running now or planned, 5 of them major.
- Major, planned
Broadway East, CarltonRemedial works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
700 m away - Major
Broadway East, CarltonRemedial works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
700 m away - Major
Victoria Road, NetherfieldWorks for road purposes · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
800 m away - Major, planned
Cavendish Road, CarltonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Mar 2027
900 m away - Major
Cavendish Road, CarltonHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Mar 2027
900 m away - Minor
Mile End Road, ColwickCore Sampling · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026
750 m away - Minor
Cavendish Road, CarltonCore Sampling · NOTTINGHAMSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
19.7 km away - RecommendationSept 2026
19.7 km away - Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton. application due March 2028
20.3 km away - RecommendationSept 2026
22.0 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
23.3 km away - Decision
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Colwick Industrial Estate (Farm and Food waste) (anaerobic digestion, 2.0 km); Severn Trent Water - Stoke Bardolph Wind Turbine (wind farm, 3.2 km); Trent Basin Community Battery (battery storage, 3.2 km); Radcliffe Solar Farm (solar farm, 3.2 km); Gedling Solar Farm (solar farm, 3.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.