What's changing near NG4 1AU
Within 2 km, around Carlton in Gedling. Building, planning, schools, transport, prices and crime.
30new homes completed within 2 km, last 2 years
99homes given permission on brownfield sites since 2021
+0.4%like-for-like prices in Carlton, 2024 → 2025 (council +1.9%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Jan 2025 – Jul 2026
Jul 2026
1.9 km away - School closed
School closed: Iona SchoolOther independent school, other independent school (closure)
Sept 2024
1.3 km away - Planning permissionJun 2022
1.8 km away - Planning permissionJun 2022
1.7 km away - Planning permissionMar 2021
900 m away - New schoolOct 2020
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
16homes extended 2021–2025, typically adding 29 m²
27since energy certificates began (2008)
2in NG4 1AU itself
- Extendedcertificate 2024
- Extendedcertificate 2023
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
46 planned, approved or being built and 15 running (42 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Colwick Loop Road, Colwick - Solar PanelsApproved, not yet built · 750 kW
Sept 2023
1.7 km away - Rooftop solar
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025
2.2 km away - Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025
2.6 km away - Rooftop solar
ENVA England, Road Number 4 - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
2.6 km away - Energy from waste
Eastcroft EfW (3rd Line)Approved, not yet built · 3 MW
Jan 2016
2.8 km away - Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026
3.2 km away - Solar farm
Radcliffe Road, Holme Pierrepont - Solar FarmApproved, not yet built · 4 MW
Dec 2022
3.4 km away - Rooftop solar
Nottingham Trent University, Maudslay - Solar PanelsApproved, not yet built · 190 kW
Dec 2024
3.6 km away - Battery storage
Burton Wood Farm, Spring Lane - Battery Energy StorageApproved, not yet built · 320 MW
Mar 2025
4.2 km away - Rooftop solar
Arnold Hill Spencer Academy - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
4.5 km away
Road and street works within 1 km
4 permitted works running now or planned, 3 of them major.
- Major, planned
Broadway East, CarltonRemedial works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
300 m away - Major
Broadway East, CarltonRemedial works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
300 m away - Major
Greendale Road, NottinghamHighway repair and maintenance works · NOTTINGHAM CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
350 m away - Minor
Mile End Road, ColwickCore Sampling · NOTTINGHAMSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
18.9 km away - RecommendationSept 2026
18.9 km away - Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton. application due March 2028
20.7 km away - RecommendationSept 2026
21.2 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
24.2 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
David Lloyd Leisure Health and Fitness Club, Rugby Road - Solar panelsApproved, not yet built · 300 kW
Running nearest: Trent Basin Community Battery (battery storage, 2.4 km); Eastcroft Municipal Depot (solar farm, 2.8 km); Eastcroft Municipal Depot (battery storage, 2.8 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 2.8 km); Colwick Industrial Estate (Farm and Food waste) (anaerobic digestion, 2.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.