What's changing near NG3 6HE
Within 2 km, around Mapperley & Porchester in Gedling. Building, planning, schools, transport, prices and crime.
53new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.2%like-for-like prices in Mapperley & Porchester, 2024 → 2025 (council +1.9%)
+26%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
8 new homes completedflats · Feb 2025 – Jan 2026
Jan 2026
700 m away - New homes
5 new homes completedhouses · Jan 2026
Jan 2026
750 m away - New homes
10 new homes completedflats · Jun 2025
Jun 2025
850 m away - New schoolJun 2024
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 24 m²
38since energy certificates began (2008)
2in NG3 6HE itself
- Extendedcertificate 2015
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
69hours of spills in 2025 between them (typical neighbourhood: about 36)
46spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
49 planned, approved or being built and 15 running (42 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Arnold Hill Spencer Academy - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
2.4 km away - Rooftop solar
Nottingham Trent University, Maudslay - Solar PanelsApproved, not yet built · 190 kW
Dec 2024
3.1 km away - Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026
3.3 km away - Energy from waste
Eastcroft EfW (3rd Line)Approved, not yet built · 3 MW
Jan 2016
3.4 km away - Rooftop solar
Colwick Loop Road, Colwick - Solar PanelsApproved, not yet built · 750 kW
Sept 2023
3.8 km away - Battery storage
Burton Wood Farm, Spring Lane - Battery Energy StorageApproved, not yet built · 320 MW
Mar 2025
3.8 km away - Rooftop solar
Pintail House, Pintail Close - Solar PanelsApproved, not yet built · 410 kW
May 2025
4.2 km away - Rooftop solar
David Lloyd Tennis And Fitness Club, Aspley Lane - Solar PanelsApproved, not yet built
Sept 2025
4.4 km away - Rooftop solar
Enviro Building, Colwick - Solar PanelsApproved, not yet built · 260 kW
Jul 2025
4.7 km away - Rooftop solar
ENVA England, Road Number 4 - Solar PanelsApproved, not yet built · 1 MW
Jul 2025
4.7 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
- Major, planned
Kent Road, MapperleyUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
500 m away - Major
Kent Road, MapperleyUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
500 m away - Major
Woodborough Road, NottinghamUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
19.2 km away - RecommendationSept 2026
19.2 km away - RecommendationSept 2026
21.6 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
22.2 km away - Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton. application due March 2028
23.0 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Gedling Solar Farm (solar farm, 3.0 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 3.4 km); Eastcroft Municipal Depot (solar farm, 3.4 km); Eastcroft Municipal Depot (battery storage, 3.4 km); Trent Basin Community Battery (battery storage, 3.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.