What's changing near NG34 9JE
Within 2 km, around Heckington in North Kesteven. Building, planning, schools, transport, prices and crime.
0new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.3%like-for-like prices in Heckington, 2024 → 2025 (council +2.2%)
-7%recorded crime, last 12 months vs the 12 before
On the map
Extended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 26 m²
20since energy certificates began (2008)
1in NG34 9JE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
376hours of spills in 2025 between them (typical neighbourhood: about 36)
51spill events counted
- Anglian Water
Heckington Stwinto Heckington Eau26 spills, 201 hours in 2025
1.7 km away - Anglian Water
Great Hale Pumping Stninto The Beck15 spills, 109 hours in 2025
1.2 km away - Anglian Water
Heckington Stwinto Heckington Eau10 spills, 66 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 4 running (90 MW between them). Those within 5 km are on the map above.
- Battery storage
Little Hale Drove, Little Hale Fen - Battery StorageApproved, not yet built · 99 MW
Mar 2025
4.2 km away - Solar farm
White Cross LaneBeing built · 25 MW
Apr 2022
4.9 km away - Solar farm
Burton Gorse Plantation, Whitecross Lane - Solar PanelsPlanning application in · 42 MW
Mar 2025
4.9 km away - Solar farm
Little Hale Fen - Solar FarmApproved, not yet built · 50 MW
Aug 2025
5.0 km away - Battery storage
Little Hale Fen - Solar FarmApproved, not yet built · 50 MW
Aug 2025
5.0 km away - Solar farm
Heckington Fen Solar ParkApproved, not yet built · 500 MW
Jan 2025
5.7 km away - Battery storage
Heckington Fen Solar Park - Battery StorageApproved, not yet built
Jan 2025
5.7 km away - Solar farm
Vicarage Drove - Solar farm & Battery storageApproved, not yet built · 50 MW
Jan 2024
7.2 km away - Battery storage
Vicarage Drove - Solar farm & Battery storageApproved, not yet built · 21 MW
Jan 2024
7.2 km away - Battery storage
Vicarage Drove - Battery Storage FacilityApproved, not yet built
Feb 2025
7.2 km away - Solar farm
Mareham Lane, Solar PV Panels
Road and street works within 1 km
4 permitted works running now or planned, 4 of them major.
- Major
Hale Road, HeckingtonWorks for Rail Purposes · NETWORK RAIL · Road closure
Jan 2027 to Jan 2027
300 m away - Major
Hale Road, HeckingtonWorks for Rail Purposes · NETWORK RAIL · Road closure
Feb 2027 to Feb 2027
300 m away - Major
Station Road, HeckingtonWorks for Rail Purposes · NETWORK RAIL · Road closure
Jan 2027 to Jan 2027
350 m away - Major
Station Road, HeckingtonWorks for Rail Purposes · NETWORK RAIL · Road closure
Feb 2027 to Feb 2027
350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Beacon Fen Energy ParkGenerating Stations · Site 2.5km N of Heckington and 6.5km NE of Sleaford, connecting to Bicker Fen. decided Aug 2026
3.9 km away - Pre-application
Lincolnshire ReservoirDams and Reservoirs · 7km southwest of Sleaford, between the settlements of Swaton, Scredington and Helpringham application due November 2028
5.2 km away - Decided
Heckington Fen Solar ParkGenerating Stations · The site is located on land to the north of East Heckington and 3.5km south east of South Kyme. decided Jan 2025
5.6 km away - Decideddecided Sept 2016
7.3 km away - Pre-application
Eastern Green Link 3 and Eastern Green Link 4Electric Lines · Land between the Scotland/England Maritime boundary in the North Sea and the Walpole area of Kings Lynn and West Norfolk, Norfolk, with a landfall on the east coast of Lincolnshire. application due October 2026
13.9 km away - Decided
Springwell Solar FarmGenerating Stations · The Site is located within the administrative boundary of North Kesteven District Council and in the County of Lincolnshire. decided Apr 202615.8 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Grange Farm (Burton Pedwardine) (solar farm, 4.3 km); Sleaford Renewable Energy Plant (biomass, 6.4 km); Bicker Fen (wind farm, 6.9 km); Deepdale Farm (solar farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.