What's changing near NG34 9BT
Within 2 km, around Ruskington South, Leasingham & Osbournby in North Kesteven. Building, planning, schools, transport, prices and crime.
73new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.8%like-for-like prices in Ruskington South, Leasingham & Osbournby, 2024 → 2025 (council +2.2%)
+9%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Apr 2026 – Jul 2026
Jul 2026
900 m away - New homes
46 new homes completedhouses · Nov 2024 – Jun 2026
Jun 2026
1000 m away - New homes
15 new homes completedhouses · Nov 2024 – Oct 2025
Oct 2025
1.1 km away - New homes
6 new homes completedhouses · Mar 2025 – Jul 2025
Jul 2025
1.1 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 44 m²
12since energy certificates began (2008)
0in NG34 9BT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
73hours of spills in 2025 between them (typical neighbourhood: about 36)
13spill events counted
- Anglian Water
Ruskington Stw Spsinto Ruskington Beck10 spills, 69 hours in 2025
950 m away - Anglian Water
Ruskington Mh0102 Manor Street Csointo The Ruskington Beck3 spills, 4 hours in 2025
550 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
8 planned, approved or being built and 4 running (96 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Pilgrims UK, Sleaford Road - Solar CanopyApproved, not yet built · 490 kW
Aug 2024
200 m away - Rooftop solar
Pilgrims Pride, Sleaford Road - Solar PanelsApproved, not yet built · 730 kW
Aug 2024
200 m away - Solar farm
Beacon Fen Energy ParkPlanning application in · 400 MW
Apr 2025
5.0 km away - Battery storage
Beacon Fen Energy ParkPlanning application in · 600 MW
Apr 2025
5.0 km away - Solar farm
Mareham Lane, Solar PV PanelsApproved, not yet built · 50 MW
Feb 2026
5.7 km away - Solar farm
White Cross LaneBeing built · 25 MW
Apr 2022
7.5 km away - Solar farm
Burton Gorse Plantation, Whitecross Lane - Solar PanelsPlanning application in · 42 MW
Mar 2025
8.3 km away - Solar farm
Gorse LaneBeing built · 20 MW
May 2021
8.4 km away
Running nearest: Deepdale Farm (solar farm, 1.8 km); Sleaford Renewable Energy Plant (biomass, 4.8 km); Grange Farm (Burton Pedwardine) (solar farm, 8.1 km); Ermine Street Farm solar park (solar farm, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Springwell Solar FarmGenerating Stations · The Site is located within the administrative boundary of North Kesteven District Council and in the County of Lincolnshire. decided Apr 2026
6.7 km away - Decided
Beacon Fen Energy ParkGenerating Stations · Site 2.5km N of Heckington and 6.5km NE of Sleaford, connecting to Bicker Fen. decided Aug 2026
7.1 km away - Pre-application
Lincolnshire ReservoirDams and Reservoirs · 7km southwest of Sleaford, between the settlements of Swaton, Scredington and Helpringham application due November 2028
11.4 km away - Decided
Heckington Fen Solar ParkGenerating Stations · The site is located on land to the north of East Heckington and 3.5km south east of South Kyme. decided Jan 2025
13.0 km away - Decideddecided Sept 2016
16.7 km away - Decision
Fosse Green Energy Generating Stations · The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln application due 18 July 2025
21.2 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.