Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
6 planned, approved or being built and 0 running. Those within 5 km are on the map above.
Solar farm
Washdyke Farm, Billingborough Road - Solar farmApproved, not yet built · 27 MW
Apr 2024 4.1 km away
Rooftop solar
Newton Grange Farm, Newton - 6 Poultry HousesPlanning application in · 600 kW
Jul 2025 6.4 km away
Rooftop solar
Viking Link, North Ing Drove - Solar PanelsPlanning application in · 180 kW
Jul 2023 8.8 km away
Solar farm
Little Hale Fen - Solar FarmApproved, not yet built · 50 MW
Aug 2025 9.6 km away
Battery storage
Little Hale Fen - Solar FarmApproved, not yet built · 50 MW
Aug 2025 9.6 km away
Battery storage
Little Hale Drove, Little Hale Fen - Battery StorageApproved, not yet built · 99 MW
Mar 2025 9.9 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned.
Minor
Millthorpe Drove, MillthorpeHighway improvement works · LINCOLNSHIRE COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 950 m away
Minor
Millthorpe Drove, MillthorpeHighway improvement works · LINCOLNSHIRE COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Lincolnshire ReservoirDams and Reservoirs · 7km southwest of Sleaford, between the settlements of Swaton, Scredington and Helpringham
application due November 2028 7.9 km away
Decided
Triton Knoll Electrical SystemElectric Lines · 33km off the Lincolnshire coast to the Triton Knoll Substation in Lincolnshire
decided Sept 2016 10.4 km away
Decided
Heckington Fen Solar ParkGenerating Stations · The site is located on land to the north of East Heckington and 3.5km south east of South Kyme.
decided Jan 2025 16.0 km away
Decided
Beacon Fen Energy ParkGenerating Stations · Site 2.5km N of Heckington and 6.5km NE of Sleaford, connecting to Bicker Fen.
decided Aug 2026 16.3 km away
Pre-application
Eastern Green Link 3 and Eastern Green Link 4Electric Lines · Land between the Scotland/England Maritime boundary in the North Sea and the Walpole area of Kings Lynn and West Norfolk, Norfolk, with a landfall on the east coast of Lincolnshire.
application due October 2026 20.1 km away
Decided
Mallard Pass Solar ProjectGenerating Stations · Land either side and in the vicinity of the East Coast Main Line, near the village of Essendine.
decided Jul 2024 21.4 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Morton & Billingborough: +20% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.0% in two years.
Springwell Solar FarmGenerating Stations · The Site is located within the administrative boundary of North Kesteven District Council and in the County of Lincolnshire.
decided Apr 2026 25.9 km away
Examination
Meridian Solar FarmGenerating Stations · North of Peterborough, 2km NE of Crowland, 6km S of Spaling, 9km NW of Wisbech.
application due March 2026 26.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.