What's changing near NG2 5HW
Within 2 km, around Lady Bay in Rushcliffe. Building, planning, schools, transport, prices and crime.
115new homes completed within 2 km, last 2 years
170homes given permission on brownfield sites since 2021
+9.2%like-for-like prices in Lady Bay, 2024 → 2025 (council +2.5%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
17 new homes completedflats · Jun 2026
Jun 2026
1.2 km away - New homes
9 new homes completedhouses · Apr 2025 – Feb 2026
Feb 2026
1.3 km away - New homes
42 new homes completedhouses · Jan 2025 – Feb 2026
Feb 2026
400 m away - New homes
10 new homes completedflats · Oct 2025
Oct 2025
1.2 km away - New homes
22 new homes completedflats · Sep 2025
Sept 2025
1.3 km away - Planning permissionOct 2023
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
44homes extended 2021–2025, typically adding 34 m²
69since energy certificates began (2008)
1in NG2 5HW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
755hours of spills in 2025 between them (typical neighbourhood: about 36)
276spill events counted
- Severn Trent Water
Sneinton Sewage Pumping Stationinto River Trent19 spills, 230 hours in 2025
1.3 km away - Severn Trent Water
Sneinton Meadow Ln/Daleside Rd Jncinto River Trent23 spills, 126 hours in 2025
1.3 km away - Severn Trent Water
Sneinton Dale/Watson St Csointo River Trent Via Beckvalley Cul73 spills, 122 hours in 2025
1.3 km away - Severn Trent Water
Meadows-Turney St& Arkwright St Csointo River Trent15 spills, 86 hours in 2025
1.4 km away - Severn Trent Water
Nottingham - Colwick Rd/Trent Ln (Cso)into River Trent27 spills, 51 hours in 2025
1.3 km away - Severn Trent Water
331 Sneinton Dale Csointo River Trent46 spills, 44 hours in 2025
1.3 km away - Severn Trent Water
Eastcroft Depot Csointo Tinkers Leen10 spills, 41 hours in 2025
1.9 km away - Severn Trent Water
Curzon Gardens Combined Sewer Overfinto River Trent37 spills, 32 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
49 planned, approved or being built and 15 running (41 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Rushcliffe School, Boundary Road - Solar PanelsApproved, not yet built
Apr 2026
1.6 km away - Rooftop solar
David Lloyd Leisure Health and Fitness Club, Rugby Road - Solar panelsApproved, not yet built · 300 kW
Mar 2024
1.8 km away - Energy from waste
Eastcroft EfW (3rd Line)Approved, not yet built · 3 MW
Jan 2016
1.9 km away - Rooftop solar
Rushcliffe arena, Rugby Road - Solar PanelsApproved, not yet built · 470 kW
Apr 2026
2.0 km away - Rooftop solar
Nottingham One, Canal Street- Solar PanelsApproved, not yet built · 180 kW
May 2026
2.5 km away - Rooftop solar
Wheatcrofts Business Park, Edwalton - Solar PanelsApproved, not yet built · 150 kW
Nov 2024
3.2 km away - Rooftop solar
Langley House, Wheatcroft Business Park - Solar PanelsApproved, not yet built · 180 kW
Apr 2026
3.2 km away - Rooftop solar
Monarch Education Furniture - Solar panelsApproved, not yet built · 880 kW
Mar 2024
3.2 km away - Rooftop solar
Nottingham Trent University, Maudslay - Solar PanelsApproved, not yet built · 190 kW
Dec 2024
3.5 km away - Rooftop solar
Sytner Group, Abbeyfield Road - Solar PanelsApproved, not yet built · 160 kW
Feb 2026
3.6 km away
Road and street works within 1 km
19 permitted works running now or planned, 10 of them major.
- Major
Radcliffe Road, West BridgfordHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Jan 2027
200 m away - Major
Albert Road, West BridgfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Nov 2026
400 m away - Major
Gertrude Road, West BridgfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Sept 2026 to Nov 2026
500 m away - Major, planned
Exchange Road, West BridgfordNew service connection · CADENT GAS LIMITED · Road closure
Feb 2027 to Feb 2027
550 m away - Major, planned
Bridgford Road, West BridgfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Jan 2027 to Feb 2027
600 m away - Major, planned
Rectory Road, West BridgfordUtility asset works · CADENT GAS LIMITED · Two-way signals
Jan 2027 to Jan 2027
650 m away - Major, planned
Bridgford Road, West BridgfordHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Mar 2027 to Mar 2027
800 m away - Major, planned
Millicent Grove, West BridgfordHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Mar 2027 to Mar 2027
850 m away - Major, planned
Millicent Road, West BridgfordHighway improvement works · NOTTINGHAMSHIRE COUNTY COUNCIL · Road closure
Mar 2027 to Mar 2027
850 m away
Major infrastructure projects within 30 km
- Decideddecided Jan 2016
15.9 km away - RecommendationSept 2026
15.9 km away - RecommendationSept 2026
18.1 km away - Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton. application due March 2028
18.8 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
24.3 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Trent Basin Community Battery (battery storage, 1.3 km); Eastcroft Municipal Depot (solar farm, 1.9 km); Eastcroft Municipal Depot (battery storage, 1.9 km); Eastcroft EfW (Lines 1 & 2) (energy from waste, 1.9 km); Willow Road - Roof mounted solar panels (rooftop solar, 4.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.