Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
755hours of spills in 2025 between them (typical neighbourhood: about 36)
276spill events counted
Severn Trent Water
Sneinton Sewage Pumping Stationinto River Trent19 spills, 230 hours in 2025
1.2 km away
Severn Trent Water
Sneinton Meadow Ln/Daleside Rd Jncinto River Trent23 spills, 126 hours in 2025
1.2 km away
Severn Trent Water
Sneinton Dale/Watson St Csointo River Trent Via Beckvalley Cul73 spills, 122 hours in 2025
1.2 km away
Severn Trent Water
Meadows-Turney St& Arkwright St Csointo River Trent15 spills, 86 hours in 2025
1.4 km away
Severn Trent Water
Nottingham - Colwick Rd/Trent Ln (Cso)into River Trent27 spills, 51 hours in 2025
1.2 km away
Severn Trent Water
331 Sneinton Dale Csointo River Trent46 spills, 44 hours in 2025
1.2 km away
Severn Trent Water
Eastcroft Depot Csointo Tinkers Leen10 spills, 41 hours in 2025
1.9 km away
Severn Trent Water
Curzon Gardens Combined Sewer Overfinto River Trent37 spills, 32 hours in 2025
East Midlands Gateway Phase 2Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 18.2 km away
Pre-application
Weston Marsh to East LeicestershireElectric Lines · A new circa 60 kilometre 400kV overhead electricity transmission line which connects into the Weston Marsh substation infrastructure (to be constructed under the Grimsby to Walpole Project), in the Spalding region of Lincolnshire, and runs west to a new 400kV transmission substation (WMEL-B) near Wartnaby in Leicestershire, via a new 400kV transmission substation (WMEL-A) near Corby Glen in Lincolnshire.
The Project also includes reconductoring of approximately 66 kilometres of existing transmission infrastructure from the new WMEL-B substation, running south to the existing Grendon substation, east of Northampton.
application due March 2028 18.8 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 24.2 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Lady Bay: +24% over five years (2020 → 2025).
Council tax list: 60 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.6% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.